Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 1999 |
Principal Product | Distillated chemicals for semi-conductors |
NAICS | n/a |
SIC | 2819 - Industrial Inorganic Chemicals, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 228 |
Plant Area (Sq.Ft.) | 62,051 |
Annual Production | 55 Thousand Gallons |
Production Hrs. Annual | 6,120 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $378,141 | 8,064,478 | kWh | $0.05 |
Electricity Demand | $244,026 | 14,938 | kW-months/year | $16.34 |
Natural Gas | $69,732 | 14,973 | MMBtu | $4.66 |
TOTAL ENERGY COSTS | $691,899 | |||
RECOMMENDED SAVINGS* | $131,159 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $113,572 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Solid Waste (haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Solid Waste (haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $20,370 Cost: $68,000 |
$7,615 | 162,368 | $12,755 | 781 | - | - | - | - | - | - | - | - | - | - |
$7,615 162,368 kWh |
$12,755 781 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD |
Savings: $2,464 Cost: $3,500 |
$1,370 | 29,308 | $1,094 | 67 | - | - | - | - | - | - | - | - | - | - |
$1,370 29,308 kWh |
$1,094 67 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $412 Cost: $144 |
$245 | 5,275 | $167 | 10 | - | - | - | - | - | - | - | - | - | - |
$245 5,275 kWh |
$167 10 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $6,142 Cost: $2,500 |
$6,442 | 137,456 | $2,430 | 149 | $(-2,730) | (-586) | - | - | - | - | - | - | - | - |
$6,442 137,456 kWh |
$2,430 149 kW-months/year |
$(-2,730) (-586) MMBtu |
- - gal |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $8,981 Cost: $9,500 |
$6,006 | 123,681 | $2,975 | 182 | - | - | - | - | - | - | - | - | - | - |
$6,006 123,681 kWh |
$2,975 182 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.8133 CONVERT TO AQUEOUS CLEANING |
Savings: $11,000 Cost: - |
- | - | - | - | - | - | $11,000 | 300 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$11,000 300 gal |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $5,400 Cost: $2,000 |
- | - | - | - | - | - | - | - | - | - | $5,400 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$5,400 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $11,118 Cost: $2,000 |
- | - | - | - | - | - | - | - | $11,118 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$11,118 - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.446 AUTOMATE FINISHING PROCESS |
Savings: $58,252 Cost: $11,700 |
- | - | - | - | - | - | - | - | - | - | - | - | $58,252 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - lb |
$58,252 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.311 SCHEDULE DELIVERIES ACCORDING TO DEMAND |
Savings: $7,020 Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | $7,020 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - lb |
$7,020 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $131,159 Cost: $99,344 |
$21,678 | 458,088 | $19,421 | 1,189 | $(-2,730) | (-586) | $11,000 | 300 | $11,118 | - | $5,400 | - | $65,272 | - | $21,678 458,088 kWh |
$19,421 1,189 kW-months/year |
$(-2,730) (-586) MMBtu |
$11,000 300 gal |
$11,118 - lb |
$5,400 - lb |
$65,272 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $113,572 Cost: $83,844 |
$7,860 | 167,643 | $12,922 | 791 | - | - | $11,000 | 300 | $11,118 | - | $5,400 | - | $65,272 | - | $7,860 167,643 kWh |
$12,922 791 kW-months/year |
- - MMBtu |
$11,000 300 gal |
$11,118 - lb |
$5,400 - lb |
$65,272 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Solid Waste (haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Solid Waste (haz) | Administrative Changes |