IAC Assessment: SD0233
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0233
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1999
Principal Product Plumbing fixtures
NAICS n/a
SIC 3432 - Plumbing Fixture Fittings And Trim
Sales $10,000,000-$50,000,000
# of Employees 145
Plant Area (Sq.Ft.) 133,000
Annual Production 8,000,000 Pieces
Production Hrs. Annual 4,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $133,211 2,678,781 kWh $0.05
Electricity Demand $79,791 8,377 kW-months/year $9.53
Electricity Fees $3,588 - $ -
Natural Gas $18,202 3,538 MMBtu $5.14
TOTAL ENERGY COSTS $239,985
RECOMMENDED SAVINGS* $80,115 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,115
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$331
Cost:
$725
$291 5,862 $40 4 - - - - - - $291
5,862
kWh
$40
4
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,292
Cost:
$360
$2,840 57,151 $1,452 152 - - - - - - $2,840
57,151
kWh
$1,452
152
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$940
Cost:
$584
$940 19,050 - - - - - - - - $940
19,050
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,392
Cost:
$1,394
- - - - $1,392 279 - - - - -
-
kWh
-
-
kW-months/year
$1,392
279
MMBtu
-
-
lb
-
-
$
05: 3.7311 MAINTAIN MACHINES TO REDUCE LEAKS Savings:
$6,160
Cost:
-
- - - - - - $6,160 24,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,160
24,000
lb
-
-
$
06: 4.446 AUTOMATE FINISHING PROCESS Savings:
$67,000
Cost:
$9,000
- - - - - - - - $67,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$67,000
-
$
TOTAL RECOMMENDED Savings:
$80,115
Cost:
$12,063
$4,071 82,063 $1,492 156 $1,392 279 $6,160 24,000 $67,000 - $4,071
82,063
kWh
$1,492
156
kW-months/year
$1,392
279
MMBtu
$6,160
24,000
lb
$67,000
-
$
TOTAL IMPLEMENTED Savings:
$13,115
Cost:
$3,063
$4,071 82,063 $1,492 156 $1,392 279 $6,160 24,000 - - $4,071
82,063
kWh
$1,492
156
kW-months/year
$1,392
279
MMBtu
$6,160
24,000
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Primary Product