IAC logo
IAC Assessment: SD0238
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0238
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2000
Principal Product combustible ordinances
NAICS n/a
SIC 3483 - Ammunition, Exc. For Small Arms, Nec
Sales $10,000,000-$50,000,000
# of Employees 240
Plant Area (Sq.Ft.) 108,000
Annual Production 600,000 Pieces
Production Hrs. Annual 4,200
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $436,048 6,618,406 kWh $0.07
Electricity Demand $54,249 19,152 kW-months/year $2.83
Electricity Fees $25,505 - $ -
Natural Gas $160,412 94,741 MMBtu $1.69
TOTAL ENERGY COSTS $707,856
RECOMMENDED SAVINGS* $428,143 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $61,356
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.2422 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM Savings:
$21,910
Cost:
$10,250
- - - - $21,910 12,965 - - - - -
-
kWh
-
-
kW-months/year
$21,910
12,965
MMBtu
-
-
Tgal
-
-
$
02: 2.2422 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM Savings:
$13,294
Cost:
$11,825
- - - - $13,294 7,866 - - - - -
-
kWh
-
-
kW-months/year
$13,294
7,866
MMBtu
-
-
Tgal
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$838
Cost:
$1,880
$792 11,430 $46 16 - - - - - - $792
11,430
kWh
$46
16
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$171,427
Cost:
$100,000
- - - - $45,427 26,880 - - $126,000 - -
-
kWh
-
-
kW-months/year
$45,427
26,880
MMBtu
-
-
Tgal
$126,000
-
$
05: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$25,314
Cost:
$100,000
- - - - - - $25,314 24,390,186 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$25,314
24,390,186
Tgal
-
-
$
06: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$188,160
Cost:
$200,000
- - - - - - - - $188,160 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$188,160
-
$
07: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$7,200
Cost:
$3,000
- - - - - - - - $7,200 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$7,200
-
$
TOTAL RECOMMENDED Savings:
$428,143
Cost:
$426,955
$792 11,430 $46 16 $80,631 47,711 $25,314 24,390,186 $321,360 - $792
11,430
kWh
$46
16
kW-months/year
$80,631
47,711
MMBtu
$25,314
24,390,186
Tgal
$321,360
-
$
TOTAL IMPLEMENTED Savings:
$61,356
Cost:
$123,955
$792 11,430 $46 16 $35,204 20,831 $25,314 24,390,186 - - $792
11,430
kWh
$46
16
kW-months/year
$35,204
20,831
MMBtu
$25,314
24,390,186
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes