IAC logo
IAC Assessment: SD0239
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0239
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2000
Principal Product sailboats
NAICS n/a
SIC 3732 - Boat Building And Repairing
Sales $5,000,000-$10,000,000
# of Employees 120
Plant Area (Sq.Ft.) 74,000
Annual Production 900 Pieces
Production Hrs. Annual 4,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $32,166 400,352 kWh $0.08
Electricity Demand $13,978 1,921 kW-months/year $7.28
Electricity Fees $2,280 - $ -
TOTAL ENERGY COSTS $51,113
RECOMMENDED SAVINGS* $100,121 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $45,216
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,960
Cost:
$300
$1,960 24,326 - - - - $1,960
24,326
kWh
-
-
kW-months/year
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,716
Cost:
-
$3,751 46,600 $965 133 - - $3,751
46,600
kWh
$965
133
kW-months/year
-
-
$
03: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING Savings:
$7,470
Cost:
$56,000
- - - - $7,470 - -
-
kWh
-
-
kW-months/year
$7,470
-
$
04: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$45,475
Cost:
$66,000
- - - - $45,475 - -
-
kWh
-
-
kW-months/year
$45,475
-
$
05: 4.4240 IMPROVE SPACE COMFORT CONDITIONING Savings:
$40,500
Cost:
$7,500
- - - - $40,500 - -
-
kWh
-
-
kW-months/year
$40,500
-
$
TOTAL RECOMMENDED Savings:
$100,121
Cost:
$129,800
$5,711 70,926 $965 133 $93,445 - $5,711
70,926
kWh
$965
133
kW-months/year
$93,445
-
$
TOTAL IMPLEMENTED Savings:
$45,216
Cost:
$7,500
$3,751 46,600 $965 133 $40,500 - $3,751
46,600
kWh
$965
133
kW-months/year
$40,500
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes