IAC Assessment: SD0241
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0241
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2000
Principal Product Men's suits
NAICS n/a
SIC 2311 - Men's and Boys' Suits, Coats, and Overcoats
Sales $10,000,000-$50,000,000
# of Employees 450
Plant Area (Sq.Ft.) 265,000
Annual Production 115,000 Pieces
Production Hrs. Annual 2,688
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $112,251 1,930,832 kWh $0.06
Electricity Demand $90,990 7,357 kW-months/year $12.37
Electricity Fees $2,088 - $ -
Natural Gas $85,825 17,758 MMBtu $4.83
TOTAL ENERGY COSTS $291,154
RECOMMENDED SAVINGS* $62,514 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,853
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$9,946
Cost:
$24,320
- - - - $9,946 2,059 - - - - -
-
kWh
-
-
kW-months/year
$9,946
2,059
MMBtu
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$9,310
Cost:
$840
$4,585 78,839 $4,725 382 - - - - - - $4,585
78,839
kWh
$4,725
382
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN Savings:
$2,831
Cost:
$6,150
- - - - $2,831 550 - - - - -
-
kWh
-
-
kW-months/year
$2,831
550
MMBtu
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,802
Cost:
-
$1,764 30,188 $1,038 84 - - - - - - $1,764
30,188
kWh
$1,038
84
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,851
Cost:
$240
$960 16,413 $891 72 - - - - - - $960
16,413
kWh
$891
72
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$274
Cost:
-
$135 2,345 $139 11 - - - - - - $135
2,345
kWh
$139
11
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$31,500
Cost:
$20,000
- - - - - - $31,500 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$31,500
-
$
-
-
$
08: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$4,000
Cost:
$500
- - - - - - - - $4,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$4,000
-
$
TOTAL RECOMMENDED Savings:
$62,514
Cost:
$52,050
$7,444 127,785 $6,793 549 $12,777 2,609 $31,500 - $4,000 - $7,444
127,785
kWh
$6,793
549
kW-months/year
$12,777
2,609
MMBtu
$31,500
-
$
$4,000
-
$
TOTAL IMPLEMENTED Savings:
$15,853
Cost:
$30,470
$1,899 32,533 $1,177 95 $12,777 2,609 - - - - $1,899
32,533
kWh
$1,177
95
kW-months/year
$12,777
2,609
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes