IAC logo
IAC Assessment: SD0245
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0245
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2000
Principal Product metal plating
NAICS n/a
SIC 3479 - Metal Coating And Allied Services
Sales $5,000,000-$10,000,000
# of Employees 30
Plant Area (Sq.Ft.) 11,100
Annual Production 50,000 Pieces
Production Hrs. Annual 2,125
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $34,442 617,819 kWh $0.06
Electricity Demand $38,197 6,762 kW-months/year $5.65
Electricity Fees $600 - $ -
Natural Gas $8,192 1,414 MMBtu $5.79
TOTAL ENERGY COSTS $85,532
RECOMMENDED SAVINGS* $42,702 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,302
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$15,319
Cost:
$14,000
$13,199 236,518 $7,973 470 $(-5,853) (-1,009) - - $13,199
236,518
kWh
$7,973
470
kW-months/year
$(-5,853)
(-1,009)
MMBtu
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$7,454
Cost:
$5,833
$3,832 68,581 $2,352 139 $1,270 219 - - $3,832
68,581
kWh
$2,352
139
kW-months/year
$1,270
219
MMBtu
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$6,787
Cost:
$2,500
$1,883 33,705 $5,858 346 $(-954) (-165) - - $1,883
33,705
kWh
$5,858
346
kW-months/year
$(-954)
(-165)
MMBtu
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,523
Cost:
$4,000
$1,205 21,688 $2,929 173 $(-611) (-105) - - $1,205
21,688
kWh
$2,929
173
kW-months/year
$(-611)
(-105)
MMBtu
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,081
Cost:
$3,000
$2,081 37,222 - - - - - - $2,081
37,222
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$905
Cost:
$900
$397 7,034 $610 36 $(-102) (-18) - - $397
7,034
kWh
$610
36
kW-months/year
$(-102)
(-18)
MMBtu
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$515
Cost:
-
$235 4,103 $280 17 - - - - $235
4,103
kWh
$280
17
kW-months/year
-
-
MMBtu
-
-
$
08: 4.6510 INSTALL BACK-UP EQUIPMENT Savings:
$6,118
Cost:
$7,000
- - - - - - $6,118 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,118
-
$
TOTAL RECOMMENDED Savings:
$42,702
Cost:
$37,233
$22,832 408,851 $20,002 1,181 $(-6,250) (-1,078) $6,118 - $22,832
408,851
kWh
$20,002
1,181
kW-months/year
$(-6,250)
(-1,078)
MMBtu
$6,118
-
$
TOTAL IMPLEMENTED Savings:
$7,302
Cost:
$2,500
$2,118 37,808 $6,138 363 $(-954) (-165) - - $2,118
37,808
kWh
$6,138
363
kW-months/year
$(-954)
(-165)
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes