Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2000 |
Principal Product | paper plates |
NAICS | n/a |
SIC | 2656 - Sanitary Food Containers |
Sales | $10,000,000-$50,000,000 |
# of Employees | 163 |
Plant Area (Sq.Ft.) | 160,000 |
Annual Production | 2,000,000,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $197,608 | 3,807,151 | kWh | $0.05 |
Electricity Demand | $138,599 | 11,168 | kW-months/year | $12.41 |
Electricity Fees | $6,066 | - | $ | - |
Natural Gas | $17,331 | 2,745 | MMBtu | $6.31 |
TOTAL ENERGY COSTS | $359,604 | |||
RECOMMENDED SAVINGS* | $151,808 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $44,264 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Administrative Changes | Electricity Usage | Electricity Demand | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $31,001 Cost: $40,000 |
$14,918 | 288,101 | $16,083 | 1,296 | - | - |
$14,918 288,101 kWh |
$16,083 1,296 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $6,837 Cost: $14,800 |
$6,837 | 131,887 | - | - | - | - |
$6,837 131,887 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE |
Savings: $4,532 Cost: $7,536 |
$1,554 | 29,894 | $2,978 | 240 | - | - |
$1,554 29,894 kWh |
$2,978 240 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $3,585 Cost: - |
$2,474 | 47,773 | $1,111 | 90 | - | - |
$2,474 47,773 kWh |
$1,111 90 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,887 Cost: $4,950 |
$1,887 | 36,342 | - | - | - | - |
$1,887 36,342 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $5,300 Cost: $12,500 |
- | - | - | - | $5,300 | - |
- - kWh |
- - kW-months/year |
$5,300 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST |
Savings: $11,600 Cost: $1,000 |
- | - | - | - | $11,600 | - |
- - kWh |
- - kW-months/year |
$11,600 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST |
Savings: $743 Cost: $800 |
- | - | - | - | $743 | - |
- - kWh |
- - kW-months/year |
$743 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $2,397 Cost: $8,500 |
- | - | - | - | $2,397 | - |
- - kWh |
- - kW-months/year |
$2,397 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT |
Savings: $70,500 Cost: $120,000 |
- | - | - | - | $70,500 | - |
- - kWh |
- - kW-months/year |
$70,500 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.444 INSTALL SYSTEM TO COLLECT SCRAP |
Savings: $13,426 Cost: $11,836 |
- | - | - | - | $13,426 | - |
- - kWh |
- - kW-months/year |
$13,426 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $151,808 Cost: $221,922 |
$27,670 | 533,997 | $20,172 | 1,626 | $103,966 | - | $27,670 533,997 kWh |
$20,172 1,626 kW-months/year |
$103,966 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $44,264 Cost: $48,622 |
$12,752 | 245,896 | $4,089 | 330 | $27,423 | - | $12,752 245,896 kWh |
$4,089 330 kW-months/year |
$27,423 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Administrative Changes | Electricity Usage | Electricity Demand | Administrative Changes |