IAC Assessment: SD0248
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0248
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2000
Principal Product paper plates
NAICS n/a
SIC 2656 - Sanitary Food Containers
Sales $10,000,000-$50,000,000
# of Employees 163
Plant Area (Sq.Ft.) 160,000
Annual Production 2,000,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $197,608 3,807,151 kWh $0.05
Electricity Demand $138,599 11,168 kW-months/year $12.41
Electricity Fees $6,066 - $ -
Natural Gas $17,331 2,745 MMBtu $6.31
TOTAL ENERGY COSTS $359,604
RECOMMENDED SAVINGS* $151,808 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,264
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$31,001
Cost:
$40,000
$14,918 288,101 $16,083 1,296 - - $14,918
288,101
kWh
$16,083
1,296
kW-months/year
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,837
Cost:
$14,800
$6,837 131,887 - - - - $6,837
131,887
kWh
-
-
kW-months/year
-
-
$
03: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$4,532
Cost:
$7,536
$1,554 29,894 $2,978 240 - - $1,554
29,894
kWh
$2,978
240
kW-months/year
-
-
$
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$3,585
Cost:
-
$2,474 47,773 $1,111 90 - - $2,474
47,773
kWh
$1,111
90
kW-months/year
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,887
Cost:
$4,950
$1,887 36,342 - - - - $1,887
36,342
kWh
-
-
kW-months/year
-
-
$
06: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$5,300
Cost:
$12,500
- - - - $5,300 - -
-
kWh
-
-
kW-months/year
$5,300
-
$
07: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$11,600
Cost:
$1,000
- - - - $11,600 - -
-
kWh
-
-
kW-months/year
$11,600
-
$
08: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$743
Cost:
$800
- - - - $743 - -
-
kWh
-
-
kW-months/year
$743
-
$
09: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$2,397
Cost:
$8,500
- - - - $2,397 - -
-
kWh
-
-
kW-months/year
$2,397
-
$
10: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$70,500
Cost:
$120,000
- - - - $70,500 - -
-
kWh
-
-
kW-months/year
$70,500
-
$
11: 4.444 INSTALL SYSTEM TO COLLECT SCRAP Savings:
$13,426
Cost:
$11,836
- - - - $13,426 - -
-
kWh
-
-
kW-months/year
$13,426
-
$
TOTAL RECOMMENDED Savings:
$151,808
Cost:
$221,922
$27,670 533,997 $20,172 1,626 $103,966 - $27,670
533,997
kWh
$20,172
1,626
kW-months/year
$103,966
-
$
TOTAL IMPLEMENTED Savings:
$44,264
Cost:
$48,622
$12,752 245,896 $4,089 330 $27,423 - $12,752
245,896
kWh
$4,089
330
kW-months/year
$27,423
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes