IAC Assessment: SD0250
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2000
Principal Product Aluminum extrusion
NAICS n/a
SIC 3354 - Aluminum Extruded Products
Sales $10,000,000-$50,000,000
# of Employees 380
Plant Area (Sq.Ft.) 216,000
Annual Production 20,000 Tons
Production Hrs. Annual 7,200
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,109,226 24,573,857 kWh $0.05
Electricity Demand $437,274 42,567 kW-months/year $10.27
Electricity Fees $3,588 - $ -
Natural Gas $1,360,222 421,389 MMBtu $3.23
TOTAL ENERGY COSTS $2,910,310
RECOMMENDED SAVINGS* $366,557 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,752
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$45,106
Cost:
$210,000
$45,106 998,242 $13,747 2,138 $(-13,747) (-4,256) - - - - - - $45,106
998,242
kWh
$13,747
2,138
kW-months/year
$(-13,747)
(-4,256)
MMBtu
-
-
Tgal
-
-
gal
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$44,752
Cost:
$600
$38,845 859,613 $18,387 1,790 - - - - - - $(-12,480) - $38,845
859,613
kWh
$18,387
1,790
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$(-12,480)
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,942
Cost:
$4,100
$1,633 36,049 $309 30 - - - - - - - - $1,633
36,049
kWh
$309
30
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
04: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$8,901
Cost:
$40,000
$6,474 143,318 $2,427 236 - - - - - - - - $6,474
143,318
kWh
$2,427
236
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
05: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$3,256
Cost:
$8,000
- - - - $3,256 1,008 - - - - - - -
-
kWh
-
-
kW-months/year
$3,256
1,008
MMBtu
-
-
Tgal
-
-
gal
-
-
$
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$148,200
Cost:
$8,000
- - - - - - - - $148,200 98,800 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$148,200
98,800
gal
-
-
$
07: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$97,460
Cost:
$135,000
- - - - - - $97,460 54,000,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$97,460
54,000,000
Tgal
-
-
gal
-
-
$
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$11,240
Cost:
$7,900
- - - - - - - - - - $11,240 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$11,240
-
$
09: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME Savings:
$5,000
Cost:
$12,500
- - - - - - - - - - $5,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$5,000
-
$
10: 3.8136 SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED Savings:
$700
Cost:
-
- - - - - - - - - - $700 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$700
-
$
TOTAL RECOMMENDED Savings:
$366,557
Cost:
$426,100
$92,058 2,037,222 $34,870 4,194 $(-10,491) (-3,248) $97,460 54,000,000 $148,200 98,800 $4,460 - $92,058
2,037,222
kWh
$34,870
4,194
kW-months/year
$(-10,491)
(-3,248)
MMBtu
$97,460
54,000,000
Tgal
$148,200
98,800
gal
$4,460
-
$
TOTAL IMPLEMENTED Savings:
$44,752
Cost:
$600
$38,845 859,613 $18,387 1,790 - - - - - - $(-12,480) - $38,845
859,613
kWh
$18,387
1,790
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$(-12,480)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Administrative Changes