Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2000 |
Principal Product | Drill bushings |
NAICS | n/a |
SIC | 3544 - Special Dies, Tools, Jigs & Fixtures |
Sales | $10,000,000-$50,000,000 |
# of Employees | 190 |
Plant Area (Sq.Ft.) | 85,000 |
Annual Production | 210,000 Pounds |
Production Hrs. Annual | 4,225 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $118,274 | 1,606,682 | kWh | $0.07 |
Electricity Demand | $39,492 | 4,768 | kW-months/year | $8.28 |
Electricity Fees | $723 | - | $ | - |
Natural Gas | $41,209 | 9,879 | MMBtu | $4.17 |
TOTAL ENERGY COSTS | $199,698 | |||
RECOMMENDED SAVINGS* | $106,545 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $7,718 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $9,187 Cost: $350 |
- | - | - | - | $9,187 | 2,187 | - | - | - | - |
- - kWh |
- - kW-months/year |
$9,187 2,187 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $4,966 Cost: $664 |
- | - | - | - | $4,966 | 1,182 | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,966 1,182 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,693 Cost: $5,000 |
$3,720 | 50,703 | $973 | 118 | - | - | - | - | - | - |
$3,720 50,703 kWh |
$973 118 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $3,316 Cost: $5,000 |
- | - | - | - | $3,316 | 790 | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,316 790 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,040 Cost: $200 |
$3,179 | 43,083 | $861 | 104 | - | - | - | - | - | - |
$3,179 43,083 kWh |
$861 104 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,438 Cost: $1,438 |
$1,137 | 15,533 | $301 | 36 | - | - | - | - | - | - |
$1,137 15,533 kWh |
$301 36 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER |
Savings: $1,315 Cost: $1,000 |
- | - | - | - | $1,315 | 313 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,315 313 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $2,240 Cost: $7,900 |
- | - | - | - | - | - | - | - | $2,240 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$2,240 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $75,350 Cost: $10,050 |
- | - | - | - | - | - | $75,350 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$75,350 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $106,545 Cost: $31,602 |
$8,036 | 109,319 | $2,135 | 258 | $18,784 | 4,472 | $75,350 | - | $2,240 | - | $8,036 109,319 kWh |
$2,135 258 kW-months/year |
$18,784 4,472 MMBtu |
$75,350 - $ |
$2,240 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $7,718 Cost: $9,538 |
$4,316 | 58,616 | $1,162 | 140 | - | - | - | - | $2,240 | - | $4,316 58,616 kWh |
$1,162 140 kW-months/year |
- - MMBtu |
- - $ |
$2,240 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes |