IAC logo
IAC Assessment: SD0253
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0253
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2000
Principal Product aluminum castings
NAICS n/a
SIC 3365 - Aluminum Foundries
Sales $5,000,000-$10,000,000
# of Employees 130
Plant Area (Sq.Ft.) 72,000
Annual Production 420,000 Pounds
Production Hrs. Annual 4,080
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $130,022 2,001,172 kWh $0.06
Electricity Demand $85,634 7,197 kW-months/year $11.90
Electricity Fees $4,483 - $ -
Natural Gas $98,479 27,583 MMBtu $3.57
TOTAL ENERGY COSTS $320,803
RECOMMENDED SAVINGS* $179,961 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$108,760
Cost:
$68,000
$74,190 1,141,852 $53,264 4,476 $(-18,694) (-5,193) - - - - $74,190
1,141,852
kWh
$53,264
4,476
kW-months/year
$(-18,694)
(-5,193)
MMBtu
-
-
lb
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$14,706
Cost:
$15,000
$5,801 89,390 $10,195 1,200 $(-1,290) (-358) - - - - $5,801
89,390
kWh
$10,195
1,200
kW-months/year
$(-1,290)
(-358)
MMBtu
-
-
lb
-
-
$
03: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$20,080
Cost:
$25,000
- - - - $20,080 5,578 - - - - -
-
kWh
-
-
kW-months/year
$20,080
5,578
MMBtu
-
-
lb
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,561
Cost:
$12,000
$8,561 131,887 - - - - - - - - $8,561
131,887
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,622
Cost:
$7,000
- - - - $2,622 734 - - - - -
-
kWh
-
-
kW-months/year
$2,622
734
MMBtu
-
-
lb
-
-
$
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$2,732
Cost:
$5,400
- - - - - - $2,732 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,732
-
lb
-
-
$
07: 4.4240 IMPROVE SPACE COMFORT CONDITIONING Savings:
$22,500
Cost:
$15,000
- - - - - - - - $22,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$22,500
-
$
TOTAL RECOMMENDED Savings:
$179,961
Cost:
$147,400
$88,552 1,363,129 $63,459 5,676 $2,718 761 $2,732 - $22,500 - $88,552
1,363,129
kWh
$63,459
5,676
kW-months/year
$2,718
761
MMBtu
$2,732
-
lb
$22,500
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes