Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2000 |
Principal Product | aluminum castings |
NAICS | n/a |
SIC | 3365 - Aluminum Foundries |
Sales | $5,000,000-$10,000,000 |
# of Employees | 130 |
Plant Area (Sq.Ft.) | 72,000 |
Annual Production | 420,000 Pounds |
Production Hrs. Annual | 4,080 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $130,022 | 2,001,172 | kWh | $0.06 |
Electricity Demand | $85,634 | 7,197 | kW-months/year | $11.90 |
Electricity Fees | $4,483 | - | $ | - |
Natural Gas | $98,479 | 27,583 | MMBtu | $3.57 |
TOTAL ENERGY COSTS | $320,803 | |||
RECOMMENDED SAVINGS* | $179,961 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $108,760 Cost: $68,000 |
$74,190 | 1,141,852 | $53,264 | 4,476 | $(-18,694) | (-5,193) | - | - | - | - |
$74,190 1,141,852 kWh |
$53,264 4,476 kW-months/year |
$(-18,694) (-5,193) MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $14,706 Cost: $15,000 |
$5,801 | 89,390 | $10,195 | 1,200 | $(-1,290) | (-358) | - | - | - | - |
$5,801 89,390 kWh |
$10,195 1,200 kW-months/year |
$(-1,290) (-358) MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT |
Savings: $20,080 Cost: $25,000 |
- | - | - | - | $20,080 | 5,578 | - | - | - | - |
- - kWh |
- - kW-months/year |
$20,080 5,578 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $8,561 Cost: $12,000 |
$8,561 | 131,887 | - | - | - | - | - | - | - | - |
$8,561 131,887 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $2,622 Cost: $7,000 |
- | - | - | - | $2,622 | 734 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,622 734 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $2,732 Cost: $5,400 |
- | - | - | - | - | - | $2,732 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,732 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.424 IMPROVE SPACE COMFORT CONDITIONING |
Savings: $22,500 Cost: $15,000 |
- | - | - | - | - | - | - | - | $22,500 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$22,500 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $179,961 Cost: $147,400 |
$88,552 | 1,363,129 | $63,459 | 5,676 | $2,718 | 761 | $2,732 | - | $22,500 | - | $88,552 1,363,129 kWh |
$63,459 5,676 kW-months/year |
$2,718 761 MMBtu |
$2,732 - lb |
$22,500 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes |