IAC Assessment: SD0254
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0254
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2000
Principal Product Magnesium castings
NAICS n/a
SIC 3365 - Aluminum Foundries
Sales $10,000,000-$50,000,000
# of Employees 42
Plant Area (Sq.Ft.) 180,000
Annual Production 0 Units
Production Hrs. Annual 2,125
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $55,039 648,886 kWh $0.08
Electricity Demand $33,409 3,852 kW-months/year $8.67
Electricity Fees $2,375 - $ -
Natural Gas $15,672 4,679 MMBtu $3.35
TOTAL ENERGY COSTS $108,532
RECOMMENDED SAVINGS* $136,374 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,285
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ lb $ $ $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$22,489
Cost:
$70,000
$13,890 163,834 $10,802 1,246 $(-2,203) (-658) - - - - - - - - $13,890
163,834
kWh
$10,802
1,246
kW-months/year
$(-2,203)
(-658)
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
02: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$5,944
Cost:
$720
$5,944 70,047 - - - - - - - - - - - - $5,944
70,047
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,974
Cost:
-
$1,974 23,154 - - - - - - - - - - - - $1,974
23,154
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,675
Cost:
-
- - - - $1,675 500 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,675
500
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
05: 3.5221 RECYCLE CASTING SAND Savings:
$90,000
Cost:
$120,000
- - - - - - - - $90,000 4,000,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$90,000
4,000,000
lb
-
-
$
-
-
$
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$1,700
Cost:
$5,400
- - - - - - $1,700 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,700
-
lb
-
-
lb
-
-
$
-
-
$
07: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$10,600
Cost:
$23,000
- - - - - - - - - - $10,600 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
$10,600
-
$
-
-
$
08: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$1,992
Cost:
-
- - - - - - - - - - - - $1,992 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
$1,992
-
$
TOTAL RECOMMENDED Savings:
$136,374
Cost:
$219,120
$21,808 257,035 $10,802 1,246 $(-528) (-158) $1,700 - $90,000 4,000,000 $10,600 - $1,992 - $21,808
257,035
kWh
$10,802
1,246
kW-months/year
$(-528)
(-158)
MMBtu
$1,700
-
lb
$90,000
4,000,000
lb
$10,600
-
$
$1,992
-
$
TOTAL IMPLEMENTED Savings:
$13,285
Cost:
$6,120
$7,918 93,201 - - $1,675 500 $1,700 - - - - - $1,992 - $7,918
93,201
kWh
-
-
kW-months/year
$1,675
500
MMBtu
$1,700
-
lb
-
-
lb
-
-
$
$1,992
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Administrative Changes One-time Revenue or Avoided Cost