IAC logo
IAC Assessment: SD0255
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0255
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2000
Principal Product brass sprinklers
NAICS n/a
SIC 3366 - Copper Foundries
Sales $5,000,000-$10,000,000
# of Employees 135
Plant Area (Sq.Ft.) 75,000
Annual Production 940,000 Pounds
Production Hrs. Annual 6,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $148,471 2,594,080 kWh $0.06
Electricity Demand $168,426 15,613 kW-months/year $10.79
Electricity Fees $2,120 - $ -
TOTAL ENERGY COSTS $329,570
RECOMMENDED SAVINGS* $192,575 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,652
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$124,864
Cost:
$87,000
$59,592 1,091,735 $81,580 8,688 $(-16,308) (-4,868) - - $59,592
1,091,735
kWh
$81,580
8,688
kW-months/year
$(-16,308)
(-4,868)
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$14,967
Cost:
$40,000
$3,699 67,702 $11,268 1,200 - - - - $3,699
67,702
kWh
$11,268
1,200
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$12,615
Cost:
$7,500
$3,601 65,944 $9,014 960 - - - - $3,601
65,944
kWh
$9,014
960
kW-months/year
-
-
MMBtu
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$7,459
Cost:
-
$694 12,016 $6,944 360 $(-179) (-53) - - $694
12,016
kWh
$6,944
360
kW-months/year
$(-179)
(-53)
MMBtu
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,611
Cost:
$350
$2,477 54,807 $1,134 378 - - - - $2,477
54,807
kWh
$1,134
378
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,869
Cost:
$1,950
$1,816 17,585 $53 17 - - - - $1,816
17,585
kWh
$53
17
kW-months/year
-
-
MMBtu
-
-
$
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$903
Cost:
$40
$238 4,103 $665 48 - - - - $238
4,103
kWh
$665
48
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$487
Cost:
$25
$138 2,345 $349 19 - - - - $138
2,345
kWh
$349
19
kW-months/year
-
-
MMBtu
-
-
$
09: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$25,800
Cost:
$23,000
- - - - - - $25,800 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$25,800
-
$
TOTAL RECOMMENDED Savings:
$192,575
Cost:
$159,865
$72,255 1,316,237 $111,007 11,670 $(-16,487) (-4,921) $25,800 - $72,255
1,316,237
kWh
$111,007
11,670
kW-months/year
$(-16,487)
(-4,921)
MMBtu
$25,800
-
$
TOTAL IMPLEMENTED Savings:
$38,652
Cost:
$47,850
$10,471 200,469 $28,360 2,898 $(-179) (-53) - - $10,471
200,469
kWh
$28,360
2,898
kW-months/year
$(-179)
(-53)
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes