IAC Assessment: SD0262
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0262
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2001
Principal Product die castings-electronic enclosures,speaker cages
NAICS n/a
SIC 3363 - Aluminum Die-castings
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 100,000
Annual Production 3,000,000 Pounds
Production Hrs. Annual 6,732
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $214,569 4,291,380 kWh $0.05
Electricity Demand $131,342 30,762 kW-months/year $4.27
Electricity Fees $82,429 - $ -
Natural Gas $272,301 70,728 MMBtu $3.85
TOTAL ENERGY COSTS $706,593
RECOMMENDED SAVINGS* $334,554 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$34,244
Cost:
$92,000
$30,730 484,704 $10,908 2,160 $(-7,394) (-1,946) - - - - - - $30,730
484,704
kWh
$10,908
2,160
kW-months/year
$(-7,394)
(-1,946)
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$112,352
Cost:
$179,000
$98,385 1,551,818 $13,967 2,765 - - - - - - - - $98,385
1,551,818
kWh
$13,967
2,765
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$18,419
Cost:
$15,000
- - - - $18,419 4,847 - - - - - - -
-
kWh
-
-
kW-months/year
$18,419
4,847
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,942
Cost:
$300
$5,203 82,061 $739 146 - - - - - - - - $5,203
82,061
kWh
$739
146
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$38,254
Cost:
$1,700
- - - - $18,058 4,752 $20,196 - - - - - -
-
kWh
-
-
kW-months/year
$18,058
4,752
MMBtu
$20,196
-
$
-
-
$
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$12,581
Cost:
$5,200
$8,317 131,178 - - $4,264 1,122 - - - - - - $8,317
131,178
kWh
-
-
kW-months/year
$4,264
1,122
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$24,738
Cost:
$40,000
$21,511 339,293 $8,726 1,728 $(-5,499) (-1,447) - - - - - - $21,511
339,293
kWh
$8,726
1,728
kW-months/year
$(-5,499)
(-1,447)
MMBtu
-
-
$
-
-
$
-
-
$
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$5,300
Cost:
$7,900
- - - - - - - - $5,300 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$5,300
-
$
-
-
$
09: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$22,032
Cost:
$4,304
- - - - - - $22,032 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$22,032
-
$
-
-
$
-
-
$
10: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$13,222
Cost:
$4,800
- - - - - - $5,712 - - - $7,510 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,712
-
$
-
-
$
$7,510
-
$
11: 4.124 INSTALL CONTINUOUS LUBRICATION EQUIPMENT Savings:
$47,470
Cost:
$72,000
- - - - - - $47,470 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$47,470
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$334,554
Cost:
$422,204
$164,146 2,589,054 $34,340 6,799 $27,848 7,328 $95,410 - $5,300 - $7,510 - $164,146
2,589,054
kWh
$34,340
6,799
kW-months/year
$27,848
7,328
MMBtu
$95,410
-
$
$5,300
-
$
$7,510
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost