IAC Assessment: SD0264
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0264
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2001
Principal Product custom plastic injected parts
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 40
Plant Area (Sq.Ft.) 25,000
Annual Production 3,000,000 Pieces
Production Hrs. Annual 6,120
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $62,227 811,560 kWh $0.08
Electricity Demand $25,971 2,971 kW-months/year $8.74
Electricity Fees $720 - $ -
TOTAL ENERGY COSTS $90,008
RECOMMENDED SAVINGS* $62,483 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$28,141
Cost:
$61,000
$21,855 284,206 $6,286 743 - - - - - - $21,855
284,206
kWh
$6,286
743
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$26,759
Cost:
$27,900
$28,802 374,544 $6,903 816 $(-8,946) (-1,420) - - - - $28,802
374,544
kWh
$6,903
816
kW-months/year
$(-8,946)
(-1,420)
MMBtu
-
-
$
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,117
Cost:
$735
$2,117 27,523 - - - - - - - - $2,117
27,523
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$3,654
Cost:
$7,900
- - - - - - $3,654 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,654
-
$
-
-
$
05: 4.651 INSTALL BACK-UP EQUIPMENT Savings:
$1,812
Cost:
$5,500
- - - - - - - - $1,812 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$1,812
-
$
TOTAL RECOMMENDED Savings:
$62,483
Cost:
$103,035
$52,774 686,273 $13,189 1,559 $(-8,946) (-1,420) $3,654 - $1,812 - $52,774
686,273
kWh
$13,189
1,559
kW-months/year
$(-8,946)
(-1,420)
MMBtu
$3,654
-
$
$1,812
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes One-time Revenue or Avoided Cost