IAC Assessment: SD0265
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0265
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2001
Principal Product naval ship repairs
NAICS n/a
SIC 3731 - Ship Building And Repairing
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 230,000
Annual Production 50 Pieces
Production Hrs. Annual 2,168
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $70,737 817,000 kWh $0.09
Electricity Demand $24,440 3,055 kW-months/year $8.00
Electricity Fees $520 - $ -
Natural Gas $3,612 458 MMBtu $7.89
TOTAL ENERGY COSTS $100,227
RECOMMENDED SAVINGS* $20,675 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,267
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (haz) Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,388
Cost:
$500
$2,901 33,499 $1,487 186 - - - - - - $2,901
33,499
kWh
$1,487
186
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$6,625
Cost:
$13,000
$5,193 59,970 $1,432 179 - - - - - - $5,193
59,970
kWh
$1,432
179
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,234
Cost:
$460
$817 9,430 $417 52 - - - - - - $817
9,430
kWh
$417
52
kW-months/year
-
-
lb
-
-
$
-
-
$
04: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$1,874
Cost:
$1,012
$1,087 12,546 $787 98 - - - - - - $1,087
12,546
kWh
$787
98
kW-months/year
-
-
lb
-
-
$
-
-
$
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$4,783
Cost:
$12,500
- - - - - - $4,783 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$4,783
-
$
-
-
$
06: 3.7311 MAINTAIN MACHINES TO REDUCE LEAKS Savings:
$1,771
Cost:
-
- - - - $833 375 - - $938 - -
-
kWh
-
-
kW-months/year
$833
375
lb
-
-
$
$938
-
$
TOTAL RECOMMENDED Savings:
$20,675
Cost:
$27,472
$9,998 115,445 $4,123 515 $833 375 $4,783 - $938 - $9,998
115,445
kWh
$4,123
515
kW-months/year
$833
375
lb
$4,783
-
$
$938
-
$
TOTAL IMPLEMENTED Savings:
$9,267
Cost:
$1,972
$4,805 55,475 $2,691 336 $833 375 - - $938 - $4,805
55,475
kWh
$2,691
336
kW-months/year
$833
375
lb
-
-
$
$938
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (haz) Administrative Changes Ancillary Material Cost