Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2001
Principal Product earplugs
NAICS n/a
SIC 3842 - Surgical Appliances And Supplies
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 150,000
Annual Production 600,000,000 Pieces
Production Hrs. Annual 6,600
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $514,687 4,711,285 kWh $0.11
Electricity Demand $102,583 10,230 kW-months/year $10.03
Electricity Fees $2,077 - $ -
Natural Gas $210,464 34,389 MMBtu $6.12
TOTAL ENERGY COSTS $829,811
RECOMMENDED SAVINGS* $413,357 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $222,600
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.1211 MOVE BOILER TO MORE EFFICIENT LOCATION Savings:
$40,607
Cost:
$10,000
$40,360 369,600 $9,629 960 $(-9,382) (-1,538) - - - - - - $40,360
369,600
kWh
$9,629
960
kW-months/year
$(-9,382)
(-1,538)
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$92,095
Cost:
$50,000
$73,850 676,279 $18,245 1,819 - - - - - - - - $73,850
676,279
kWh
$18,245
1,819
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$26,840
Cost:
$4,000
- - - - $26,840 4,400 - - - - - - -
-
kWh
-
-
kW-months/year
$26,840
4,400
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$7,953
Cost:
$16,000
$5,613 51,400 $2,340 233 - - - - - - - - $5,613
51,400
kWh
$2,340
233
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,448
Cost:
$2,060
- - - - $4,448 729 - - - - - - -
-
kWh
-
-
kW-months/year
$4,448
729
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.1211 MOVE BOILER TO MORE EFFICIENT LOCATION Savings:
$10,321
Cost:
$17,000
$8,649 79,200 $3,611 360 $(-1,939) (-318) - - - - - - $8,649
79,200
kWh
$3,611
360
kW-months/year
$(-1,939)
(-318)
MMBtu
-
-
$
-
-
$
-
-
$
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$7,700
Cost:
$15,000
- - - - - - - - $7,700 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$7,700
-
$
-
-
$
08: 4.446 AUTOMATE FINISHING PROCESS Savings:
$145,400
Cost:
$150,000
- - - - - - $145,400 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$145,400
-
$
-
-
$
-
-
$
09: 4.446 AUTOMATE FINISHING PROCESS Savings:
$77,200
Cost:
$80,000
- - - - - - $77,200 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$77,200
-
$
-
-
$
-
-
$
10: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$793
Cost:
-
- - - - - - - - - - $793 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$793
-
$
TOTAL RECOMMENDED Savings:
$413,357
Cost:
$344,060
$128,472 1,176,479 $33,825 3,372 $19,967 3,273 $222,600 - $7,700 - $793 - $128,472
1,176,479
kWh
$33,825
3,372
kW-months/year
$19,967
3,273
MMBtu
$222,600
-
$
$7,700
-
$
$793
-
$
TOTAL IMPLEMENTED Savings:
$222,600
Cost:
$230,000
- - - - - - $222,600 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$222,600
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes One-time Revenue or Avoided Cost