IAC Assessment: SD0279
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0279
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2001
Principal Product Aluminum forgings
NAICS n/a
SIC 3463 - Nonferrous Forgings
Sales $50,000,000-$100,000,000
# of Employees 210
Plant Area (Sq.Ft.) 250,000
Annual Production 6,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $698,130 12,957,410 kWh $0.05
Electricity Demand $49,231 48,814 kW-months/year $1.01
Electricity Fees $29,500 - $ -
Natural Gas $868,736 157,395 MMBtu $5.52
TOTAL ENERGY COSTS $1,652,876
RECOMMENDED SAVINGS* $1,086,319 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $355,449
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$27,073
Cost:
$1,400
$26,255 486,206 $818 810 - - - - - - - - $26,255
486,206
kWh
$818
810
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,923
Cost:
$3,500
$1,893 35,053 $30 29 - - - - - - - - $1,893
35,053
kWh
$30
29
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$155,224
Cost:
$451,000
$147,484 2,731,183 $7,740 7,663 - - - - - - - - $147,484
2,731,183
kWh
$7,740
7,663
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$46,505
Cost:
$45,000
- - - - $46,505 8,502 - - - - - - -
-
kWh
-
-
kW-months/year
$46,505
8,502
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$2,287
Cost:
$3,400
$2,191 40,582 $96 96 - - - - - - - - $2,191
40,582
kWh
$96
96
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$5,667
Cost:
$1,000
- - - - $5,667 1,036 - - - - - - -
-
kWh
-
-
kW-months/year
$5,667
1,036
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.2525 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA Savings:
$36,592
Cost:
$20,000
- - - - $108,592 19,674 $(-72,000) - - - - - -
-
kWh
-
-
kW-months/year
$108,592
19,674
MMBtu
$(-72,000)
-
$
-
-
$
-
-
$
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,950
Cost:
$5,000
- - - - $6,950 1,271 - - - - - - -
-
kWh
-
-
kW-months/year
$6,950
1,271
MMBtu
-
-
$
-
-
$
-
-
$
09: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$540
Cost:
$1,500
$432 7,998 $108 107 - - - - - - - - $432
7,998
kWh
$108
107
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
10: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$466,185
Cost:
$5,112,000
$1,793,153 26,136,000 $43,996 43,560 $(-1,934,148) (-353,592) - - $563,184 - - - $1,793,153
26,136,000
kWh
$43,996
43,560
kW-months/year
$(-1,934,148)
(-353,592)
MMBtu
-
-
$
$563,184
-
$
-
-
$
11: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$10,164
Cost:
$15,000
- - - - - - - - $(-700) - $10,864 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$(-700)
-
$
$10,864
-
$
12: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$4,500
Cost:
$600
- - - - - - - - - - $4,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$4,500
-
$
13: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$322,709
Cost:
$20,000
- - - - - - - - - - $322,709 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$322,709
-
$
TOTAL RECOMMENDED Savings:
$1,086,319
Cost:
$5,679,400
$1,971,408 29,437,022 $52,788 52,265 $(-1,766,434) (-323,109) $(-72,000) - $562,484 - $338,073 - $1,971,408
29,437,022
kWh
$52,788
52,265
kW-months/year
$(-1,766,434)
(-323,109)
MMBtu
$(-72,000)
-
$
$562,484
-
$
$338,073
-
$
TOTAL IMPLEMENTED Savings:
$355,449
Cost:
$22,400
$26,255 486,206 $818 810 $5,667 1,036 - - - - $322,709 - $26,255
486,206
kWh
$818
810
kW-months/year
$5,667
1,036
MMBtu
-
-
$
-
-
$
$322,709
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes One-time Revenue or Avoided Cost