IAC Assessment: SD0284
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0284
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2001
Principal Product metal products for contruction of buildings
NAICS n/a
SIC 3448 - Prefabricated Metal Buildings
Sales $50,000,000-$100,000,000
# of Employees 190
Plant Area (Sq.Ft.) 140,000
Annual Production 84,000 Tons
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $260,660 2,520,524 kWh $0.10
Electricity Demand $55,946 7,146 kW-months/year $7.83
Electricity Fees $2,784 - $ -
Natural Gas $12,645 1,388 MMBtu $9.11
TOTAL ENERGY COSTS $341,456
RECOMMENDED SAVINGS* $346,383 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $182,830
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ gal $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$35,467
Cost:
$2,580
$29,811 377,471 $5,656 726 - - - - - - $29,811
377,471
kWh
$5,656
726
kW-months/year
-
-
gal
-
-
$
-
-
$
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$16,645
Cost:
$20,000
$16,645 193,098 - - - - - - - - $16,645
193,098
kWh
-
-
kW-months/year
-
-
gal
-
-
$
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$8,020
Cost:
$4,000
$6,816 79,067 $1,204 152 - - - - - - $6,816
79,067
kWh
$1,204
152
kW-months/year
-
-
gal
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$14,223
Cost:
$30,000
$11,511 133,542 $2,712 342 - - - - - - $11,511
133,542
kWh
$2,712
342
kW-months/year
-
-
gal
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,771
Cost:
-
$5,567 71,377 $1,204 154 - - - - - - $5,567
71,377
kWh
$1,204
154
kW-months/year
-
-
gal
-
-
$
-
-
$
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$23,814
Cost:
$1,000
$19,896 246,996 $3,918 501 - - - - - - $19,896
246,996
kWh
$3,918
501
kW-months/year
-
-
gal
-
-
$
-
-
$
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$6,639
Cost:
$240
$6,639 77,014 - - - - - - - - $6,639
77,014
kWh
-
-
kW-months/year
-
-
gal
-
-
$
-
-
$
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$30,429
Cost:
-
$25,859 299,991 $4,570 577 - - - - - - $25,859
299,991
kWh
$4,570
577
kW-months/year
-
-
gal
-
-
$
-
-
$
09: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS Savings:
$7,125
Cost:
$2,000
- - - - $7,125 7,410 - - - - -
-
kWh
-
-
kW-months/year
$7,125
7,410
gal
-
-
$
-
-
$
10: 4.311 SCHEDULE DELIVERIES ACCORDING TO DEMAND Savings:
$69,350
Cost:
$25,000
- - - - - - - - $69,350 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
$69,350
-
$
11: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$71,880
Cost:
$4,000
- - - - - - $71,880 - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$71,880
-
$
-
-
$
12: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$27,940
Cost:
$70,000
- - - - - - $27,940 - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$27,940
-
$
-
-
$
13: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$28,080
Cost:
$7,000
- - - - - - $28,080 - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$28,080
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$346,383
Cost:
$165,820
$122,744 1,478,556 $19,264 2,452 $7,125 7,410 $127,900 - $69,350 - $122,744
1,478,556
kWh
$19,264
2,452
kW-months/year
$7,125
7,410
gal
$127,900
-
$
$69,350
-
$
TOTAL IMPLEMENTED Savings:
$182,830
Cost:
$50,580
$92,211 1,117,556 $14,144 1,804 $7,125 7,410 - - $69,350 - $92,211
1,117,556
kWh
$14,144
1,804
kW-months/year
$7,125
7,410
gal
-
-
$
$69,350
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $ $ $
Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes One-time Revenue or Avoided Cost