IAC logo
IAC Assessment: SD0294
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0294
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2002
Principal Product beer
NAICS n/a
SIC 2085 - Distilled And Blended Liquors
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 20,000
Annual Production 20,000 BBL
Production Hrs. Annual 3,500
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $44,167 310,080 kWh $0.14
Electricity Demand $12,301 1,085 kW-months/year $11.34
Electricity Fees $537 - $ -
Natural Gas $42,120 3,519 MMBtu $11.97
TOTAL ENERGY COSTS $119,735
RECOMMENDED SAVINGS* $29,009 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,904
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Electricity Usage Natural Gas Water Disposal
$ kWh $ MMBtu $ Tgal
01: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$9,512
Cost:
$6,000
- - $9,512 793 - - -
-
kWh
$9,512
793
MMBtu
-
-
Tgal
02: 2.2522 ISOLATE HOT OR COLD EQUIPMENT Savings:
$3,123
Cost:
$5,200
$3,123 21,945 - - - - $3,123
21,945
kWh
-
-
MMBtu
-
-
Tgal
03: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$4,969
Cost:
$2,000
- - $4,969 414 - - -
-
kWh
$4,969
414
MMBtu
-
-
Tgal
04: 2.2694 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE Savings:
$501
Cost:
$20
$501 12 - - - - $501
12
kWh
-
-
MMBtu
-
-
Tgal
05: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$10,904
Cost:
$2,000
- - - - $10,904 - -
-
kWh
-
-
MMBtu
$10,904
-
Tgal
TOTAL RECOMMENDED Savings:
$29,009
Cost:
$15,220
$3,624 21,957 $14,481 1,207 $10,904 - $3,624
21,957
kWh
$14,481
1,207
MMBtu
$10,904
-
Tgal
TOTAL IMPLEMENTED Savings:
$10,904
Cost:
$2,000
- - - - $10,904 - -
-
kWh
-
-
MMBtu
$10,904
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal
Electricity Usage Natural Gas Water Disposal Electricity Usage Natural Gas Water Disposal