Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2002 |
Principal Product | Paper bags |
NAICS | n/a |
SIC | 2674 - Bags: Uncoated Paper & Multiwall |
Sales | n/a |
# of Employees | 95 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 33,175 Tons |
Production Hrs. Annual | 6,600 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $304,198 | 2,675,804 | kWh | $0.11 |
Electricity Demand | $46,792 | 5,663 | kW-months/year | $8.26 |
Electricity Fees | $720 | - | $ | - |
Natural Gas | $7,854 | 1,027 | MMBtu | $7.65 |
TOTAL ENERGY COSTS | $363,275 | |||
RECOMMENDED SAVINGS* | $44,740 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $20,836 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $9,966 Cost: $720 |
$8,812 | 77,505 | $1,154 | 140 | - | - | - | - | - | - |
$8,812 77,505 kWh |
$1,154 140 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $5,989 Cost: $1,000 |
$5,287 | 46,500 | $702 | 85 | - | - | - | - | - | - |
$5,287 46,500 kWh |
$702 85 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE |
Savings: $4,898 Cost: $1,000 |
$4,898 | 43,076 | - | - | - | - | - | - | - | - |
$4,898 43,076 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,115 Cost: $6,000 |
$2,752 | 24,205 | $363 | 44 | - | - | - | - | - | - |
$2,752 24,205 kWh |
$363 44 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES |
Savings: $2,448 Cost: $2,560 |
- | - | - | - | $2,448 | 3,200 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,448 3,200 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $2,446 Cost: - |
$2,161 | 19,008 | $285 | 35 | - | - | - | - | - | - |
$2,161 19,008 kWh |
$285 35 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $8,422 Cost: $10,000 |
- | - | - | - | - | - | $8,422 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$8,422 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.8123 PAY UTILITY BILLS ON TIME |
Savings: $7,456 Cost: - |
- | - | - | - | - | - | - | - | $7,456 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$7,456 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $44,740 Cost: $21,280 |
$23,910 | 210,294 | $2,504 | 304 | $2,448 | 3,200 | $8,422 | - | $7,456 | - | $23,910 210,294 kWh |
$2,504 304 kW-months/year |
$2,448 3,200 MMBtu |
$8,422 - lb |
$7,456 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $20,836 Cost: $13,280 |
$8,812 | 77,505 | $1,154 | 140 | $2,448 | 3,200 | $8,422 | - | - | - | $8,812 77,505 kWh |
$1,154 140 kW-months/year |
$2,448 3,200 MMBtu |
$8,422 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes |