Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2003 |
Principal Product | Aluminum Extrusion |
NAICS | 331318 - Other Aluminum Rolling, Drawing, and Extruding |
SIC | 3354 - Aluminum Extruded Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 80 |
Plant Area (Sq.Ft.) | 65,000 |
Annual Production | 17,000,000 Pounds |
Production Hrs. Annual | 6,000 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $403,156 | 3,830,247 | kWh | $0.11 |
Electricity Fees | $96,089 | - | $ | - |
Natural Gas | $264,738 | 39,377 | MMBtu | $6.72 |
TOTAL ENERGY COSTS | $778,983 | |||
RECOMMENDED SAVINGS* | $459,816 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $19,445 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (haz) | Administrative Changes | Electricity Usage | Electricity Demand | Solid Waste (haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT |
Savings: $374,073 Cost: $1,142,500 |
$299,107 | 2,285,000 | $74,966 | 457 | - | - | - | - |
$299,107 2,285,000 kWh |
$74,966 457 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $23,480 Cost: $14,000 |
$20,281 | 195,387 | $3,199 | 234 | - | - | - | - |
$20,281 195,387 kWh |
$3,199 234 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $10,693 Cost: $16,000 |
$5,977 | 57,580 | $4,716 | 345 | - | - | - | - |
$5,977 57,580 kWh |
$4,716 345 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $9,894 Cost: $3,000 |
$3,503 | 33,750 | $6,391 | 270 | - | - | - | - |
$3,503 33,750 kWh |
$6,391 270 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $9,878 Cost: $280 |
$7,817 | 75,288 | $2,061 | 151 | - | - | - | - |
$7,817 75,288 kWh |
$2,061 151 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $7,797 Cost: - |
$6,200 | 59,739 | $1,597 | 117 | - | - | - | - |
$6,200 59,739 kWh |
$1,597 117 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $6,916 Cost: $2,000 |
$6,916 | 66,726 | - | - | - | - | - | - |
$6,916 66,726 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $2,515 Cost: $4,000 |
$2,174 | 20,947 | $341 | 25 | - | - | - | - |
$2,174 20,947 kWh |
$341 25 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE |
Savings: $1,770 Cost: - |
$1,401 | 1,350 | $369 | 27 | - | - | - | - |
$1,401 1,350 kWh |
$369 27 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $10,000 Cost: $15,000 |
- | - | - | - | $10,000 | 176,000 | - | - |
- - kWh |
- - kW-months/year |
$10,000 176,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $2,800 Cost: $5,000 |
- | - | - | - | - | - | $2,800 | - |
- - kWh |
- - kW-months/year |
- - lb |
$2,800 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $459,816 Cost: $1,201,780 |
$353,376 | 2,795,767 | $93,640 | 1,626 | $10,000 | 176,000 | $2,800 | - | $353,376 2,795,767 kWh |
$93,640 1,626 kW-months/year |
$10,000 176,000 lb |
$2,800 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $19,445 Cost: $280 |
$15,418 | 136,377 | $4,027 | 295 | - | - | - | - | $15,418 136,377 kWh |
$4,027 295 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (haz) | Administrative Changes | Electricity Usage | Electricity Demand | Solid Waste (haz) | Administrative Changes |