IAC Assessment: SD0326
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0326
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2003
Principal Product Steel pipes
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $1,000,000-$5,000,000
# of Employees 35
Plant Area (Sq.Ft.) 3,092,760
Annual Production 700 Tons
Production Hrs. Annual 2,338
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $160,951 1,438,111 kWh $0.11
Electricity Demand $50,262 3,600 kW-months/year $13.96
TOTAL ENERGY COSTS $211,213
RECOMMENDED SAVINGS* $130,354 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,397
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$44,623
Cost:
-
$26,354 235,089 $18,269 1,282 - - $26,354
235,089
kWh
$18,269
1,282
kW-months/year
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$35,397
Cost:
$4,000
$35,397 315,759 - - - - $35,397
315,759
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$15,861
Cost:
$20,000
$9,173 81,830 $8,550 600 $(-1,862) (-372) $9,173
81,830
kWh
$8,550
600
kW-months/year
$(-1,862)
(-372)
MMBtu
04: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$14,893
Cost:
$7,700
$14,893 148,928 - - - - $14,893
148,928
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$7,795
Cost:
$384
$4,717 42,075 $3,078 216 - - $4,717
42,075
kWh
$3,078
216
kW-months/year
-
-
MMBtu
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$4,905
Cost:
$7,000
$2,896 25,836 $2,009 141 - - $2,896
25,836
kWh
$2,009
141
kW-months/year
-
-
MMBtu
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$4,846
Cost:
$6,000
$2,594 23,140 $2,252 158 - - $2,594
23,140
kWh
$2,252
158
kW-months/year
-
-
MMBtu
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,034
Cost:
$500
$2,034 18,144 - - - - $2,034
18,144
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$130,354
Cost:
$45,584
$98,058 890,801 $34,158 2,397 $(-1,862) (-372) $98,058
890,801
kWh
$34,158
2,397
kW-months/year
$(-1,862)
(-372)
MMBtu
TOTAL IMPLEMENTED Savings:
$35,397
Cost:
$4,000
$35,397 315,759 - - - - $35,397
315,759
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas