Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2003 |
Principal Product | Aerospace fasteners |
NAICS | 332722 - Bolt, Nut, Screw, Rivet, and Washer Manufacturing |
SIC | 3452 - Bolts, Nuts, Rivets, And Washers |
Sales | $10,000,000-$50,000,000 |
# of Employees | 175 |
Plant Area (Sq.Ft.) | 77,000 |
Annual Production | 200,000 Pounds |
Production Hrs. Annual | 5,087 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $243,649 | 2,119,924 | kWh | $0.11 |
Electricity Demand | $88,106 | 6,508 | kW-months/year | $13.54 |
Electricity Fees | $9,029 | - | $ | - |
Natural Gas | $12,086 | 1,950 | MMBtu | $6.20 |
TOTAL ENERGY COSTS | $359,870 | |||
RECOMMENDED SAVINGS* | $126,994 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $887 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $20,782 Cost: $1,425 |
$17,182 | 146,231 | $3,600 | 266 | - | - | - | - | - | - |
$17,182 146,231 kWh |
$3,600 266 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $3,189 Cost: $6,000 |
$1,309 | 11,138 | $2,194 | 162 | $(-314) | (-51) | - | - | - | - |
$1,309 11,138 kWh |
$2,194 162 kW-months/year |
$(-314) (-51) MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $1,836 Cost: $4,000 |
$1,454 | 12,375 | $731 | 54 | $(-349) | (-54) | - | - | - | - |
$1,454 12,375 kWh |
$731 54 kW-months/year |
$(-349) (-54) MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $887 Cost: $80 |
$724 | 6,159 | $163 | 12 | - | - | - | - | - | - |
$724 6,159 kWh |
$163 12 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $3,500 Cost: $10,000 |
- | - | - | - | - | - | $3,500 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,500 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.446 AUTOMATE FINISHING PROCESS |
Savings: $96,800 Cost: $200,000 |
- | - | - | - | - | - | - | - | $96,800 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$96,800 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $126,994 Cost: $221,505 |
$20,669 | 175,903 | $6,688 | 494 | $(-663) | (-105) | $3,500 | - | $96,800 | - | $20,669 175,903 kWh |
$6,688 494 kW-months/year |
$(-663) (-105) MMBtu |
$3,500 - lb |
$96,800 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $887 Cost: $80 |
$724 | 6,159 | $163 | 12 | - | - | - | - | - | - | $724 6,159 kWh |
$163 12 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes |