IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2004
Principal Product Print newspapers
NAICS 511110 - Newspaper Publishers
SIC 2711 - Newspapers
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 70,000
Annual Production 365 Pieces
Production Hrs. Annual 8,372
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $259,632 2,876,627 kWh $0.09
Electricity Demand $88,692 5,914 kW-months/year $15.00
Natural Gas $42,618 7,476 MMBtu $5.70
TOTAL ENERGY COSTS $428,322
RECOMMENDED SAVINGS* $31,133 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Primary Product Electricity Usage Solid Waste (non-haz) Primary Product
$ kWh $ lb $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,938
Cost:
$280
$5,938 65,789 - - - - $5,938
65,789
kWh
-
-
lb
-
-
$
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,765
Cost:
$2,800
$1,765 19,551 - - - - $1,765
19,551
kWh
-
-
lb
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$949
Cost:
$875
$949 10,514 - - - - $949
10,514
kWh
-
-
lb
-
-
$
04: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$18,690
Cost:
$10,000
- - $18,690 - - - -
-
kWh
$18,690
-
lb
-
-
$
05: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$3,791
Cost:
$3,500
- - - - $3,791 - -
-
kWh
-
-
lb
$3,791
-
$
TOTAL RECOMMENDED Savings:
$31,133
Cost:
$17,455
$8,652 95,854 $18,690 - $3,791 - $8,652
95,854
kWh
$18,690
-
lb
$3,791
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
lb
-
-
$
Savings
Cost
$ kWh $ lb $ $
Electricity Usage Solid Waste (non-haz) Primary Product Electricity Usage Solid Waste (non-haz) Primary Product