IAC logo
IAC Assessment: SD0348
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0348
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2004
Principal Product CDs and DVDs
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 60,000
Annual Production 28,000,000 Pieces
Production Hrs. Annual 8,400
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $183,394 1,956,180 kWh $0.09
Electricity Demand $66,418 4,353 kW-months/year $15.26
TOTAL ENERGY COSTS $249,812
RECOMMENDED SAVINGS* $96,166 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Raw Material Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Raw Material Primary Product
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$12,921
Cost:
$12,655
$8,816 93,985 $4,105 269 - - - - - - $8,816
93,985
kWh
$4,105
269
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,682
Cost:
$2,600
$995 10,612 $687 45 - - - - - - $995
10,612
kWh
$687
45
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,371
Cost:
$747
$1,371 14,622 - - - - - - - - $1,371
14,622
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,538
Cost:
$1,720
$1,538 9,715 - - - - - - - - $1,538
9,715
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$5,553
Cost:
$18,500
- - - - $5,553 - - - - - -
-
kWh
-
-
kW-months/year
$5,553
-
lb
-
-
$
-
-
$
06: 4.2110 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$70,166
Cost:
$43,083
- - - - - - $70,166 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$70,166
-
$
-
-
$
07: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$2,935
Cost:
$3,500
- - - - - - - - $2,935 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$2,935
-
$
TOTAL RECOMMENDED Savings:
$96,166
Cost:
$82,805
$12,720 128,934 $4,792 314 $5,553 - $70,166 - $2,935 - $12,720
128,934
kWh
$4,792
314
kW-months/year
$5,553
-
lb
$70,166
-
$
$2,935
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Raw Material Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Raw Material Primary Product