IAC logo
IAC Assessment: SD0355
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0355
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2005
Principal Product shock and vibration measuring equipment
NAICS 334519 - Other Measuring and Controlling Device Manufacturing
SIC 3829 - Measuring & Controlling Devices, Nec
Sales $50,000,000-$100,000,000
# of Employees 400
Plant Area (Sq.Ft.) 125,000
Annual Production 0 Pieces
Production Hrs. Annual 3,713
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $371,621 3,978,014 kWh $0.09
Electricity Demand $156,738 10,765 kW-months/year $14.56
TOTAL ENERGY COSTS $528,359
RECOMMENDED SAVINGS* $35,282 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,352
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz)
$ kWh $ kW-months/year $ gal $ lb
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$8,531
Cost:
$1,040
$8,531 91,335 - - - - - - $8,531
91,335
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$7,397
Cost:
-
$7,397 79,200 - - - - - - $7,397
79,200
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,058
Cost:
-
$1,058 11,324 - - - - - - $1,058
11,324
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$586
Cost:
$648
$295 3,155 $291 20 - - - - $295
3,155
kWh
$291
20
kW-months/year
-
-
gal
-
-
lb
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$897
Cost:
$700
$897 9,600 - - - - - - $897
9,600
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$15,253
Cost:
$18,500
- - - - - - $15,253 - -
-
kWh
-
-
kW-months/year
-
-
gal
$15,253
-
lb
07: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$1,560
Cost:
$1,300
- - - - $1,560 429 - - -
-
kWh
-
-
kW-months/year
$1,560
429
gal
-
-
lb
TOTAL RECOMMENDED Savings:
$35,282
Cost:
$22,188
$18,178 194,614 $291 20 $1,560 429 $15,253 - $18,178
194,614
kWh
$291
20
kW-months/year
$1,560
429
gal
$15,253
-
lb
TOTAL IMPLEMENTED Savings:
$9,352
Cost:
$700
$9,352 100,124 - - - - - - $9,352
100,124
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb
Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz)