Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2005 |
Principal Product | Flat glass |
NAICS | 327211 - Flat Glass Manufacturing |
SIC | 3211 - Flat Glass |
Sales | $50,000,000-$100,000,000 |
# of Employees | 265 |
Plant Area (Sq.Ft.) | 225,000 |
Annual Production | 268,000 Pieces |
Production Hrs. Annual | 8,736 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $3,581 | 45,850 | kWh | $0.08 |
Electricity Demand | $131,452 | 82,158 | kW-months/year | $1.60 |
Natural Gas | $7,952 | 1,228 | MMBtu | $6.48 |
TOTAL ENERGY COSTS | $142,985 | |||
RECOMMENDED SAVINGS* | $1,046,605 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $100,563 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $630,305 Cost: $1,330,000 |
$900,612 | 11,531,520 | $29,568 | 18,480 | $(-299,875) | (-46,291) | - | - | - | - | - | - |
$900,612 11,531,520 kWh |
$29,568 18,480 kW-months/year |
$(-299,875) (-46,291) MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT |
Savings: $82,741 Cost: $534,444 |
$256,020 | 3,278,105 | $7,584 | 4,740 | $(-149,373) | (-22,977) | - | - | $(-31,490) | - | - | - |
$256,020 3,278,105 kWh |
$7,584 4,740 kW-months/year |
$(-149,373) (-22,977) MMBtu |
- - lb |
$(-31,490) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $61,107 Cost: $38,800 |
$59,435 | 761,011 | $1,672 | 1,045 | - | - | - | - | - | - | - | - |
$59,435 761,011 kWh |
$1,672 1,045 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,456 Cost: $3,500 |
$3,456 | 67,376 | - | - | - | - | - | - | - | - | - | - |
$3,456 67,376 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $36,000 Cost: $20,000 |
- | - | - | - | - | - | $36,000 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$36,000 - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT |
Savings: $232,996 Cost: $340,000 |
- | - | - | - | - | - | - | - | - | - | $232,996 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$232,996 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,046,605 Cost: $2,266,744 |
$1,219,523 | 15,638,012 | $38,824 | 24,265 | $(-449,248) | (-69,268) | $36,000 | - | $(-31,490) | - | $232,996 | - | $1,219,523 15,638,012 kWh |
$38,824 24,265 kW-months/year |
$(-449,248) (-69,268) MMBtu |
$36,000 - lb |
$(-31,490) - $ |
$232,996 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $100,563 Cost: $62,300 |
$62,891 | 828,387 | $1,672 | 1,045 | - | - | $36,000 | - | - | - | - | - | $62,891 828,387 kWh |
$1,672 1,045 kW-months/year |
- - MMBtu |
$36,000 - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Primary Product |