Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2005
Principal Product Corrugated fiberboard
NAICS 326191 - Plastics Plumbing Fixture Manufacturing
SIC 3088 - Plastics Plumbing Fixtures
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 213,000
Annual Production 60,000 Tons
Production Hrs. Annual 6,732
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $698,705 8,334,974 kWh $0.08
Electricity Demand $116,367 11,218 kW-months/year $10.37
Natural Gas $305,179 49,676 MMBtu $6.14
TOTAL ENERGY COSTS $1,120,251
RECOMMENDED SAVINGS* $55,007 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,876
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$7,131
Cost:
$15,000
- - - - $7,131 1,258 - - -
-
kWh
-
-
kW-months/year
$7,131
1,258
MMBtu
-
-
lb
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,570
Cost:
$280
$2,925 34,905 $645 62 - - - - $2,925
34,905
kWh
$645
62
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,916
Cost:
$144
$1,916 22,863 - - - - - - $1,916
22,863
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$390
Cost:
$170
$390 4,653 - - - - - - $390
4,653
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$42,000
Cost:
$18,500
- - - - - - $42,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$42,000
-
lb
TOTAL RECOMMENDED Savings:
$55,007
Cost:
$34,094
$5,231 62,421 $645 62 $7,131 1,258 $42,000 - $5,231
62,421
kWh
$645
62
kW-months/year
$7,131
1,258
MMBtu
$42,000
-
lb
TOTAL IMPLEMENTED Savings:
$5,876
Cost:
$594
$5,231 62,421 $645 62 - - - - $5,231
62,421
kWh
$645
62
kW-months/year
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)