IAC logo
IAC Assessment: SD0379
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0379
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2006
Principal Product Aerospace hydraulic actuators
NAICS 333995 - Fluid Power Cylinder and Actuator Manufacturing
SIC 3593 - Fluid Power Cylinders & Actuators
Sales $100,000,000-$500,000,000
# of Employees 1,400
Plant Area (Sq.Ft.) 370,000
Annual Production 0 Units
Production Hrs. Annual 7,956
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,195,034 20,934,534 kWh $0.10
Electricity Demand $476,773 47,648 kW-months/year $10.01
Natural Gas $2,093 3,965 MMBtu $0.53
TOTAL ENERGY COSTS $2,673,900
RECOMMENDED SAVINGS* $610,425 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,974
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$212,485
Cost:
$900,288
$134,847 1,285,490 $77,638 7,756 - - $134,847
1,285,490
kWh
$77,638
7,756
kW-months/year
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$169,122
Cost:
-
- - - - $169,122 - -
-
kWh
-
-
kW-months/year
$169,122
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$110,534
Cost:
$160,385
$110,534 1,053,710 - - - - $110,534
1,053,710
kWh
-
-
kW-months/year
-
-
$
04: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$82,170
Cost:
$150,000
$82,170 783,321 - - - - $82,170
783,321
kWh
-
-
kW-months/year
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$23,140
Cost:
$18,110
$23,140 220,599 - - - - $23,140
220,599
kWh
-
-
kW-months/year
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,974
Cost:
$220
$11,472 109,359 $1,502 150 - - $11,472
109,359
kWh
$1,502
150
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$610,425
Cost:
$1,229,003
$362,163 3,452,479 $79,140 7,906 $169,122 - $362,163
3,452,479
kWh
$79,140
7,906
kW-months/year
$169,122
-
$
TOTAL IMPLEMENTED Savings:
$12,974
Cost:
$220
$11,472 109,359 $1,502 150 - - $11,472
109,359
kWh
$1,502
150
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees