IAC logo
IAC Assessment: SD0382
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0382
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2006
Principal Product roof tile
NAICS 324122 - Asphalt Shingle and Coating Materials Manufacturing
SIC 3269 - Pottery Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 95
Plant Area (Sq.Ft.) 100,000
Annual Production 30,000,000 Pieces
Production Hrs. Annual 8,652
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $301,132 9,416,180 kWh $0.03
Electricity Demand $140,140 16,744 kW-months/year $8.37
Natural Gas $2,096,318 2,824,223 MMBtu $0.74
TOTAL ENERGY COSTS $2,537,590
RECOMMENDED SAVINGS* $214,782 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$134,839
Cost:
$448,000
- - - - $134,839 181,664 - - -
-
kWh
-
-
kW-months/year
$134,839
181,664
MMBtu
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$52,310
Cost:
$8,020
- - - - $52,310 70,471 - - -
-
kWh
-
-
kW-months/year
$52,310
70,471
MMBtu
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,389
Cost:
$12,675
$6,389 88,748 - - - - - - $6,389
88,748
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,784
Cost:
$2,937
$1,349 18,736 $435 52 - - - - $1,349
18,736
kWh
$435
52
kW-months/year
-
-
MMBtu
-
-
$
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$19,460
Cost:
$19,500
- - - - - - $19,460 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$19,460
-
$
TOTAL RECOMMENDED Savings:
$214,782
Cost:
$491,132
$7,738 107,484 $435 52 $187,149 252,135 $19,460 - $7,738
107,484
kWh
$435
52
kW-months/year
$187,149
252,135
MMBtu
$19,460
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost