IAC logo
IAC Assessment: SD0420
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0420
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2009
Principal Product Server Cabinets and Cable Management Racks
NAICS 333517 - Machine Tool Manufacturing
SIC 3542 - Machine Tools, Metal Forming Types
Sales <$500,000
# of Employees 115
Plant Area (Sq.Ft.) 67,000
Annual Production 160,000 Pieces
Production Hrs. Annual 3,250
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $186,247 2,535,600 kWh $0.07
Electricity Demand $120,361 7,908 kW-months/year $15.22
Natural Gas $99,911 10,120 MMBtu $9.87
TOTAL ENERGY COSTS $406,519
RECOMMENDED SAVINGS* $11,586 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $685
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$685
Cost:
-
$685 9,328 - - $685
9,328
kWh
-
-
kW-months/year
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$383
Cost:
$246
$383 5,216 - - $383
5,216
kWh
-
-
kW-months/year
03: 2.7134 USE PHOTOCELL CONTROLS Savings:
$3,350
Cost:
$4,950
$3,350 45,582 - - $3,350
45,582
kWh
-
-
kW-months/year
04: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$5,037
Cost:
$3,000
$2,358 32,085 $2,679 176 $2,358
32,085
kWh
$2,679
176
kW-months/year
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,131
Cost:
$3,573
$2,131 28,995 - - $2,131
28,995
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$11,586
Cost:
$11,769
$8,907 121,206 $2,679 176 $8,907
121,206
kWh
$2,679
176
kW-months/year
TOTAL IMPLEMENTED Savings:
$685
Cost:
-
$685 9,328 - - $685
9,328
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand