IAC Assessment: SD0437
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0437
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2011
Principal Product Aerospace Sealants
NAICS 325520 - Adhesive Manufacturing
SIC 2891 - Adhesives And Sealants
Sales $1,000,000-$5,000,000
# of Employees 95
Plant Area (Sq.Ft.) 50,000
Annual Production 1,000 Units
Production Hrs. Annual 3,120
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $135,564 1,504,708 kWh $0.09
Electricity Demand $57,554 4,347 kW-months/year $13.24
Electricity Fees $24,390 - $ -
Natural Gas $12,428 1,549 MMBtu $8.02
TOTAL ENERGY COSTS $229,936
RECOMMENDED SAVINGS* $70,234 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $61,452
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$3,036
Cost:
-
$3,036 33,696 - - - - $3,036
33,696
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$58,730
Cost:
$2,850
$69,614 772,632 $14,000 1,058 $(-24,884) (-3,102) $69,614
772,632
kWh
$14,000
1,058
kW-months/year
$(-24,884)
(-3,102)
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,552
Cost:
$214
$3,552 39,424 - - - - $3,552
39,424
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$2,194
Cost:
$610
$2,194 24,353 - - - - $2,194
24,353
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,326
Cost:
$700
$1,104 12,250 $222 17 - - $1,104
12,250
kWh
$222
17
kW-months/year
-
-
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,396
Cost:
$2,000
$1,396 15,489 - - - - $1,396
15,489
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$70,234
Cost:
$6,374
$80,896 897,844 $14,222 1,075 $(-24,884) (-3,102) $80,896
897,844
kWh
$14,222
1,075
kW-months/year
$(-24,884)
(-3,102)
MMBtu
TOTAL IMPLEMENTED Savings:
$61,452
Cost:
$5,550
$72,114 800,371 $14,222 1,075 $(-24,884) (-3,102) $72,114
800,371
kWh
$14,222
1,075
kW-months/year
$(-24,884)
(-3,102)
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas