IAC Assessment: SD0439
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0439
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2011
Principal Product Gas Turbine Engines
NAICS 334519 - Other Measuring and Controlling Device Manufacturing
SIC 3829 - Measuring & Controlling Devices, Nec
Sales >$500,000,000
# of Employees 750
Plant Area (Sq.Ft.) 270,000
Annual Production 5,000 Units
Production Hrs. Annual 5,616
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $596,733 5,856,033 kWh $0.10
Electricity Demand $249,572 15,467 kW-months/year $16.14
Electricity Fees $55,368 - $ -
TOTAL ENERGY COSTS $901,673
RECOMMENDED SAVINGS* $304,239 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,054
Cost:
$100
$2,054 20,159 - - $2,054
20,159
kWh
-
-
kW-months/year
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,678
Cost:
$700
$4,661 45,745 $1,017 63 $4,661
45,745
kWh
$1,017
63
kW-months/year
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$16,510
Cost:
$5,375
$16,510 162,026 - - $16,510
162,026
kWh
-
-
kW-months/year
04: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$5,851
Cost:
$8,326
$4,253 41,735 $1,598 99 $4,253
41,735
kWh
$1,598
99
kW-months/year
05: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$110,990
Cost:
$185,200
$110,990 1,089,207 - - $110,990
1,089,207
kWh
-
-
kW-months/year
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$163,156
Cost:
$302,600
$163,156 1,601,134 - - $163,156
1,601,134
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$304,239
Cost:
$502,301
$301,624 2,960,006 $2,615 162 $301,624
2,960,006
kWh
$2,615
162
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand