IAC logo
IAC Assessment: SD0453
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0453
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2012
Principal Product Roofing Granules
NAICS 324122 - Asphalt Shingle and Coating Materials Manufacturing
SIC 2952 - Asphalt Felts And Coatings
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 653,400
Annual Production 1,000,000 Pounds
Production Hrs. Annual 4,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $957,448 13,854,771 kWh $0.07
Electricity Demand $496,000 41,962 kW-months/year $11.82
Electricity Fees $(-21,673) - $ -
Natural Gas $1,181,602 230,185 MMBtu $5.13
TOTAL ENERGY COSTS $2,613,377
RECOMMENDED SAVINGS* $116,913 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $103,513
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$19,250
Cost:
$200
$9,450 136,700 $9,800 830 - - $9,450
136,700
kWh
$9,800
830
kW-months/year
-
-
MMBtu
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$11,500
Cost:
$200
$11,500 166,400 - - - - $11,500
166,400
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,950
Cost:
$200
$5,950 86,200 - - - - $5,950
86,200
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,913
Cost:
$2,000
$9,550 138,100 $3,363 285 - - $9,550
138,100
kWh
$3,363
285
kW-months/year
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$49,200
Cost:
$24,400
- - - - $49,200 9,590 -
-
kWh
-
-
kW-months/year
$49,200
9,590
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,400
Cost:
$25,600
$13,400 194,600 - - - - $13,400
194,600
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,700
Cost:
$12,150
$4,700 68,200 - - - - $4,700
68,200
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$116,913
Cost:
$64,750
$54,550 790,200 $13,163 1,115 $49,200 9,590 $54,550
790,200
kWh
$13,163
1,115
kW-months/year
$49,200
9,590
MMBtu
TOTAL IMPLEMENTED Savings:
$103,513
Cost:
$39,150
$41,150 595,600 $13,163 1,115 $49,200 9,590 $41,150
595,600
kWh
$13,163
1,115
kW-months/year
$49,200
9,590
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas