IAC Assessment: SD0479
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0479
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2014
Principal Product Carbon Brakes
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 115
Plant Area (Sq.Ft.) 55,000
Annual Production 31,555 Pieces
Production Hrs. Annual 4,290
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,272,045 15,532,046 kWh $0.08
Electricity Demand $479,317 34,593 kW-months/year $13.86
Electricity Fees $107,779 - $ -
Natural Gas $894,900 158,372 MMBtu $5.65
TOTAL ENERGY COSTS $2,754,041
RECOMMENDED SAVINGS* $518,790 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $59,890
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$360,753
Cost:
$1,272,000
$504,180 6,156,043 $124,740 9,000 $(-145,046) (-25,671) $(-123,121) - $504,180
6,156,043
kWh
$124,740
9,000
kW-months/year
$(-145,046)
(-25,671)
MMBtu
$(-123,121)
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$67,610
Cost:
$30,440
$62,216 759,661 $23,700 1,710 $(-18,306) (-3,240) - - $62,216
759,661
kWh
$23,700
1,710
kW-months/year
$(-18,306)
(-3,240)
MMBtu
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$45,591
Cost:
$59,600
$40,294 491,978 $5,297 382 - - - - $40,294
491,978
kWh
$5,297
382
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2422 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM Savings:
$28,012
Cost:
$38,000
- - - - $28,012 4,958 - - -
-
kWh
-
-
kW-months/year
$28,012
4,958
MMBtu
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$14,299
Cost:
$21,315
$12,512 152,768 $1,787 129 - - - - $12,512
152,768
kWh
$1,787
129
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,525
Cost:
$2,865
$2,041 24,926 $484 35 - - - - $2,041
24,926
kWh
$484
35
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$518,790
Cost:
$1,424,220
$621,243 7,585,376 $156,008 11,256 $(-135,340) (-23,953) $(-123,121) - $621,243
7,585,376
kWh
$156,008
11,256
kW-months/year
$(-135,340)
(-23,953)
MMBtu
$(-123,121)
-
$
TOTAL IMPLEMENTED Savings:
$59,890
Cost:
$80,915
$52,806 644,746 $7,084 511 - - - - $52,806
644,746
kWh
$7,084
511
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes