Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2014 |
Principal Product | Carbon Brakes |
NAICS | 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728 - Aircraft Parts And Equipment, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 115 |
Plant Area (Sq.Ft.) | 55,000 |
Annual Production | 31,555 Pieces |
Production Hrs. Annual | 4,290 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,272,045 | 15,532,046 | kWh | $0.08 |
Electricity Demand | $479,317 | 34,593 | kW-months/year | $13.86 |
Electricity Fees | $107,779 | - | $ | - |
Natural Gas | $894,900 | 158,372 | MMBtu | $5.65 |
TOTAL ENERGY COSTS | $2,754,041 | |||
RECOMMENDED SAVINGS* | $518,790 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $59,890 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $360,753 Cost: $1,272,000 |
$504,180 | 6,156,043 | $124,740 | 9,000 | $(-145,046) | (-25,671) | $(-123,121) | - |
$504,180 6,156,043 kWh |
$124,740 9,000 kW-months/year |
$(-145,046) (-25,671) MMBtu |
$(-123,121) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $67,610 Cost: $30,440 |
$62,216 | 759,661 | $23,700 | 1,710 | $(-18,306) | (-3,240) | - | - |
$62,216 759,661 kWh |
$23,700 1,710 kW-months/year |
$(-18,306) (-3,240) MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $45,591 Cost: $59,600 |
$40,294 | 491,978 | $5,297 | 382 | - | - | - | - |
$40,294 491,978 kWh |
$5,297 382 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2422 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM |
Savings: $28,012 Cost: $38,000 |
- | - | - | - | $28,012 | 4,958 | - | - |
- - kWh |
- - kW-months/year |
$28,012 4,958 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $14,299 Cost: $21,315 |
$12,512 | 152,768 | $1,787 | 129 | - | - | - | - |
$12,512 152,768 kWh |
$1,787 129 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,525 Cost: $2,865 |
$2,041 | 24,926 | $484 | 35 | - | - | - | - |
$2,041 24,926 kWh |
$484 35 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $518,790 Cost: $1,424,220 |
$621,243 | 7,585,376 | $156,008 | 11,256 | $(-135,340) | (-23,953) | $(-123,121) | - | $621,243 7,585,376 kWh |
$156,008 11,256 kW-months/year |
$(-135,340) (-23,953) MMBtu |
$(-123,121) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $59,890 Cost: $80,915 |
$52,806 | 644,746 | $7,084 | 511 | - | - | - | - | $52,806 644,746 kWh |
$7,084 511 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes |