Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2014
Principal Product Mexican Chorizo
NAICS 311612 - Meat Processed from Carcasses
SIC 2013 - Sausages And Other Prepared Meats
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 42,000
Annual Production 3,000,000 Pieces
Production Hrs. Annual 4,160
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $144,615 1,584,960 kWh $0.09
Electricity Demand $76,388 7,761 kW-months/year $9.84
Electricity Fees $18,116 - $ -
Natural Gas $24,321 3,120 MMBtu $7.79
TOTAL ENERGY COSTS $263,440
RECOMMENDED SAVINGS* $16,087 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,363
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$9,150
Cost:
$3,300
$7,413 81,284 $4,251 432 $(-2,514) (-347) $7,413
81,284
kWh
$4,251
432
kW-months/year
$(-2,514)
(-347)
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,842
Cost:
$5,480
- - - - $1,842 254 -
-
kWh
-
-
kW-months/year
$1,842
254
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,773
Cost:
$3,775
$1,468 16,099 $305 31 - - $1,468
16,099
kWh
$305
31
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,633
Cost:
$500
$1,633 17,909 - - - - $1,633
17,909
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$730
Cost:
$867
$730 8,005 - - - - $730
8,005
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$519
Cost:
$1,550
$480 5,261 $39 4 - - $480
5,261
kWh
$39
4
kW-months/year
-
-
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$440
Cost:
$200
$440 4,821 - - - - $440
4,821
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$16,087
Cost:
$15,672
$12,164 133,379 $4,595 467 $(-672) (-93) $12,164
133,379
kWh
$4,595
467
kW-months/year
$(-672)
(-93)
MMBtu
TOTAL IMPLEMENTED Savings:
$11,363
Cost:
$7,275
$9,321 102,204 $4,556 463 $(-2,514) (-347) $9,321
102,204
kWh
$4,556
463
kW-months/year
$(-2,514)
(-347)
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas