Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2017 |
Principal Product | Dyed Textiles |
NAICS | 313310 - Textile and Fabric Finishing Mills |
SIC | 2253 - Knit Outerwear Mills |
Sales | $10,000,000-$50,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 66,000 |
Annual Production | 500,000 Units |
Production Hrs. Annual | 8,640 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,540,249 | 14,012,111 | kWh | $0.11 |
Electricity Demand | $538,379 | 36,239 | kW-months/year | $14.86 |
Electricity Fees | $35,853 | - | $ | - |
Natural Gas | $594,020 | 423,079 | MMBtu | $1.40 |
TOTAL ENERGY COSTS | $2,708,501 | |||
RECOMMENDED SAVINGS* | $661,860 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $128,840 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Usage | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Usage | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $526,998 Cost: $1,348,560 |
$541,236 | 4,924,800 | $106,992 | 7,200 | $(-98,496) | - | $(-22,734) | (-16,238) | - | - |
$541,236 4,924,800 kWh |
$106,992 7,200 kW-months/year |
$(-98,496) - $ |
$(-22,734) (-16,238) MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $119,615 Cost: $210,000 |
$(-17,309) | (-157,500) | $(-3,251) | (-219) | - | - | - | - | $140,175 | 52,500 |
$(-17,309) (-157,500) kWh |
$(-3,251) (-219) kW-months/year |
- - $ |
- - MMBtu |
$140,175 52,500 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $9,225 Cost: $2,500 |
$9,225 | 83,942 | - | - | - | - | - | - | - | - |
$9,225 83,942 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,945 Cost: $600 |
$3,945 | 35,900 | - | - | - | - | - | - | - | - |
$3,945 35,900 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $2,077 Cost: $9,750 |
- | - | - | - | - | - | $2,077 | 1,484 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$2,077 1,484 MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $661,860 Cost: $1,571,410 |
$537,097 | 4,887,142 | $103,741 | 6,981 | $(-98,496) | - | $(-20,657) | (-14,754) | $140,175 | 52,500 | $537,097 4,887,142 kWh |
$103,741 6,981 kW-months/year |
$(-98,496) - $ |
$(-20,657) (-14,754) MMBtu |
$140,175 52,500 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $128,840 Cost: $212,500 |
$(-8,084) | (-73,558) | $(-3,251) | (-219) | - | - | - | - | $140,175 | 52,500 | $(-8,084) (-73,558) kWh |
$(-3,251) (-219) kW-months/year |
- - $ |
- - MMBtu |
$140,175 52,500 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Usage | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Usage |