IAC Assessment: SD0625
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0625
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2023
Principal Product Antibodies, Cell Therapies
NAICS 325414 - Biological Product (except Diagnostic) Manufacturing
SIC 2836 - Biological Products Exc. Diagnostic
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 42,000
Annual Production 100,000 Units
Production Hrs. Annual 2,295
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $241,273 1,863,698 kWh $0.13
Electricity Demand $237,440 8,584 kW-months/year $27.66
Natural Gas $83,581 6,230 MMBtu $13.42
TOTAL ENERGY COSTS $562,294
RECOMMENDED SAVINGS* $112,789 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$100,326
Cost:
$408,646
$46,694 360,570 $53,632 1,939 - - $46,694
360,570
kWh
$53,632
1,939
kW-months/year
-
-
MMBtu
02: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$868
Cost:
$4,212
- - - - $868 65 -
-
kWh
-
-
kW-months/year
$868
65
MMBtu
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$348
Cost:
$1,355
$348 2,687 - - - - $348
2,687
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE Savings:
$8,765
Cost:
$13,961
$4,146 32,015 $4,619 167 - - $4,146
32,015
kWh
$4,619
167
kW-months/year
-
-
MMBtu
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,482
Cost:
$5,000
- - - - $2,482 185 -
-
kWh
-
-
kW-months/year
$2,482
185
MMBtu
TOTAL RECOMMENDED Savings:
$112,789
Cost:
$433,174
$51,188 395,272 $58,251 2,106 $3,350 250 $51,188
395,272
kWh
$58,251
2,106
kW-months/year
$3,350
250
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas