Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2024 |
Principal Product | Insulated Copper and Specialty Wire |
NAICS | 331420 - Copper Rolling, Drawing, Extruding, and Alloying |
SIC | 3357 - Nonferrous Wiredrawing & Insulating |
Sales | $100,000,000-$500,000,000 |
# of Employees | 76 |
Plant Area (Sq.Ft.) | 60,733 |
Annual Production | 500,000 Units |
Production Hrs. Annual | 4,667 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $70,634 | 425,003 | kWh | $0.17 |
Electricity Demand | $43,888 | 2,789 | kW-months/year | $15.74 |
Electricity Fees | $18,244 | - | $ | - |
Natural Gas | $52,094 | 3,104 | MMBtu | $16.78 |
TOTAL ENERGY COSTS | $184,860 | |||
RECOMMENDED SAVINGS* | $85,100 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $7,673 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $338 Cost: $424 |
$298 | 1,791 | $40 | 3 | - | - |
$298 1,791 kWh |
$40 3 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $55,833 Cost: $125,021 |
$44,500 | 267,750 | $11,333 | 720 | - | - |
$44,500 267,750 kWh |
$11,333 720 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL |
Savings: $11,390 Cost: - |
$(-5,609) | (-33,750) | $16,999 | 1,080 | - | - |
$(-5,609) (-33,750) kWh |
$16,999 1,080 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2211 USE OPTIMUM TEMPERATURE |
Savings: $6,846 Cost: - |
- | - | - | - | $6,846 | 408 |
- - kWh |
- - kW-months/year |
$6,846 408 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING |
Savings: $2,058 Cost: $4,196 |
$1,554 | 9,346 | $504 | 32 | - | - |
$1,554 9,346 kWh |
$504 32 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING |
Savings: $6,190 Cost: $4,926 |
$4,673 | 28,115 | $1,517 | 96 | - | - |
$4,673 28,115 kWh |
$1,517 96 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $489 Cost: $250 |
$489 | 2,944 | - | - | - | - |
$489 2,944 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4223 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM |
Savings: $1,956 Cost: $2,000 |
$1,956 | 11,772 | - | - | - | - |
$1,956 11,772 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $85,100 Cost: $136,817 |
$47,861 | 287,968 | $30,393 | 1,931 | $6,846 | 408 | $47,861 287,968 kWh |
$30,393 1,931 kW-months/year |
$6,846 408 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $7,673 Cost: $674 |
$787 | 4,735 | $40 | 3 | $6,846 | 408 | $787 4,735 kWh |
$40 3 kW-months/year |
$6,846 408 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |