IAC Assessment: SD0668
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0668
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2025
Principal Product Gas Turbines
NAICS 333611 - Turbine and Turbine Generator Set Units Manufacturing
SIC 3511 - Turbines And Turbine Generator Sets
Sales $50,000,000-$100,000,000
# of Employees 110
Plant Area (Sq.Ft.) 69,000
Annual Production 200 Units
Production Hrs. Annual 2,423
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $288,832 1,681,371 kWh $0.17
Electricity Demand $127,278 13,815 kW-months/year $9.21
Electricity Fees $56,733 - $ -
Natural Gas $26,052 3,483 MMBtu $7.48
TOTAL ENERGY COSTS $498,895
RECOMMENDED SAVINGS* $466,893 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$254,982
Cost:
$555,003
$207,801 1,209,550 $47,181 5,123 $207,801
1,209,550
kWh
$47,181
5,123
kW-months/year
02: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL Savings:
$66,206
Cost:
$29,341
$(-38,578) (-224,550) $104,784 11,377 $(-38,578)
(-224,550)
kWh
$104,784
11,377
kW-months/year
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,775
Cost:
-
$1,775 10,334 - - $1,775
10,334
kWh
-
-
kW-months/year
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,208
Cost:
$2,050
$3,208 18,675 - - $3,208
18,675
kWh
-
-
kW-months/year
05: 2.4223 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM Savings:
$3,614
Cost:
$4,200
$3,614 21,035 - - $3,614
21,035
kWh
-
-
kW-months/year
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$922
Cost:
$1,623
$834 4,852 $89 10 $834
4,852
kWh
$89
10
kW-months/year
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$300
Cost:
$1,214
$271 1,581 $29 3 $271
1,581
kWh
$29
3
kW-months/year
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,230
Cost:
$3,246
$1,112 6,470 $118 13 $1,112
6,470
kWh
$118
13
kW-months/year
09: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$134,656
Cost:
-
$131,736 766,799 $2,920 317 $131,736
766,799
kWh
$2,920
317
kW-months/year
TOTAL RECOMMENDED Savings:
$466,893
Cost:
$596,677
$311,772 1,814,746 $155,120 16,843 $311,772
1,814,746
kWh
$155,120
16,843
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand