IAC logo
IAC Assessment: SD0669
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0669
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2025
Principal Product Gloves
NAICS 326299 - All Other Rubber Product Manufacturing
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 19,770
Annual Production 209,000 Pieces
Production Hrs. Annual 8,736
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $320,540 1,037,218 kWh $0.31
Electricity Demand $157,394 2,370 kW-months/year $66.42
Natural Gas $38,520 3,272 MMBtu $11.77
TOTAL ENERGY COSTS $516,454
RECOMMENDED SAVINGS* $387,039 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$298,549
Cost:
$273,844
$156,277 505,750 $142,272 2,142 $156,277
505,750
kWh
$142,272
2,142
kW-months/year
02: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL Savings:
$20,905
Cost:
$894
$(-2,114) (-6,840) $23,019 347 $(-2,114)
(-6,840)
kWh
$23,019
347
kW-months/year
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,779
Cost:
-
$1,779 5,757 - - $1,779
5,757
kWh
-
-
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,099
Cost:
$2,437
$6,253 20,235 $1,846 28 $6,253
20,235
kWh
$1,846
28
kW-months/year
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$14,398
Cost:
$3,518
$11,116 35,974 $3,282 49 $11,116
35,974
kWh
$3,282
49
kW-months/year
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,220
Cost:
$1,016
$1,714 5,546 $506 8 $1,714
5,546
kWh
$506
8
kW-months/year
07: 2.4223 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM Savings:
$19,984
Cost:
$1,400
$19,984 64,673 - - $19,984
64,673
kWh
-
-
kW-months/year
08: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$21,106
Cost:
$91,450
$11,587 37,497 $9,519 143 $11,587
37,497
kWh
$9,519
143
kW-months/year
TOTAL RECOMMENDED Savings:
$387,039
Cost:
$374,559
$206,595 668,592 $180,444 2,717 $206,595
668,592
kWh
$180,444
2,717
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand