IAC logo
IAC Assessment: SF0072
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0072
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1995
Principal Product Anodized Aluminum
NAICS n/a
SIC 3471 - Plating And Polishing
Sales <$500,000
# of Employees 8
Plant Area (Sq.Ft.) 12,000
Annual Production 454,920 Pounds
Production Hrs. Annual 2,346
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $16,033 117,819 kWh $0.14
Natural Gas $46,284 7,233 MMBtu $6.40
TOTAL ENERGY COSTS $62,317
RECOMMENDED SAVINGS* $8,585 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,149
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal By-product Production Electricity Usage Natural Gas Water Disposal By-product Production
$ kWh $ MMBtu $ Tgal $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$510
Cost:
-
$510 5,275 - - - - - - $510
5,275
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$79
Cost:
$169
$79 879 - - - - - - $79
879
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,389
Cost:
$1,123
- - $3,389 453 - - - - -
-
kWh
$3,389
453
MMBtu
-
-
Tgal
-
-
$
04: 2.2514 COVER OPEN TANKS Savings:
$98
Cost:
$77
$98 879 - - - - - - $98
879
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
05: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE Savings:
$462
Cost:
$250
- - - - - - $462 - -
-
kWh
-
-
MMBtu
-
-
Tgal
$462
-
$
06: 3.1222 REDUCE WATER USE WITH COUNTER CURRENT RINSING Savings:
$4,047
Cost:
$933
- - - - $4,047 717,082 - - -
-
kWh
-
-
MMBtu
$4,047
717,082
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$8,585
Cost:
$2,552
$687 7,033 $3,389 453 $4,047 717,082 $462 - $687
7,033
kWh
$3,389
453
MMBtu
$4,047
717,082
Tgal
$462
-
$
TOTAL IMPLEMENTED Savings:
$1,149
Cost:
$496
$687 7,033 - - - - $462 - $687
7,033
kWh
-
-
MMBtu
-
-
Tgal
$462
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ $