Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1997
Principal Product Babbitt Bearings
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $5,000,000-$10,000,000
# of Employees 45
Plant Area (Sq.Ft.) 25,000
Annual Production 1,400 Pieces
Production Hrs. Annual 2,600
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $17,985 222,157 kWh $0.08
Electricity Demand $4,390 1,048 kW-months/year $4.19
Natural Gas $14,396 2,688 MMBtu $5.36
TOTAL ENERGY COSTS $31,996
RECOMMENDED SAVINGS* $6,676 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,676
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,069
Cost:
$1,500
$864 10,551 $205 49 - - $864
10,551
kWh
$205
49
kW-months/year
-
-
lb
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,307
Cost:
-
$1,248 14,947 $59 14 - - $1,248
14,947
kWh
$59
14
kW-months/year
-
-
lb
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$790
Cost:
$60
$638 7,913 $152 36 - - $638
7,913
kWh
$152
36
kW-months/year
-
-
lb
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,633
Cost:
-
$1,257 15,533 $376 90 - - $1,257
15,533
kWh
$376
90
kW-months/year
-
-
lb
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$143
Cost:
$720
$143 1,758 - - - - $143
1,758
kWh
-
-
kW-months/year
-
-
lb
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,656
Cost:
$2,000
$1,656 90,563 - - - - $1,656
90,563
kWh
-
-
kW-months/year
-
-
lb
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$78
Cost:
$120
- - - - $78 16,224 -
-
kWh
-
-
kW-months/year
$78
16,224
lb
TOTAL RECOMMENDED Savings:
$6,676
Cost:
$4,400
$5,806 141,265 $792 189 $78 16,224 $5,806
141,265
kWh
$792
189
kW-months/year
$78
16,224
lb
TOTAL IMPLEMENTED Savings:
$6,676
Cost:
$4,400
$5,806 141,265 $792 189 $78 16,224 $5,806
141,265
kWh
$792
189
kW-months/year
$78
16,224
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)