IAC logo
IAC Assessment: SF0221
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0221
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2001
Principal Product Plastic Molding
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 83,000
Annual Production 350 Tons
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $294,544 2,754,626 kWh $0.11
Natural Gas $5,373 507 MMBtu $10.60
TOTAL ENERGY COSTS $338,357
RECOMMENDED SAVINGS* $74,282 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,051
#|Description Savings
Cost
Status Electricity Usage Other Liquid (non-haz) Electricity Usage Other Liquid (non-haz)
$ kWh $ gal
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$185
Cost:
-
$185 1,521 - - $185
1,521
kWh
-
-
gal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,977
Cost:
$480
$4,977 44,803 - - $4,977
44,803
kWh
-
-
gal
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,046
Cost:
$344
$2,046 16,801 - - $2,046
16,801
kWh
-
-
gal
04: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$2,217
Cost:
$495
$2,217 18,204 - - $2,217
18,204
kWh
-
-
gal
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,099
Cost:
$840
$1,099 9,023 - - $1,099
9,023
kWh
-
-
gal
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,141
Cost:
$7,697
$7,141 58,632 - - $7,141
58,632
kWh
-
-
gal
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,570
Cost:
$2,262
$1,570 12,890 - - $1,570
12,890
kWh
-
-
gal
08: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$1,259
Cost:
$1,259
$1,259 50,657 - - $1,259
50,657
kWh
-
-
gal
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$53,204
Cost:
$139,820
$53,204 436,815 - - $53,204
436,815
kWh
-
-
gal
10: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$584
Cost:
$80
- - $584 - -
-
kWh
$584
-
gal
TOTAL RECOMMENDED Savings:
$74,282
Cost:
$153,277
$73,698 649,346 $584 - $73,698
649,346
kWh
$584
-
gal
TOTAL IMPLEMENTED Savings:
$9,051
Cost:
$2,163
$8,467 113,782 $584 - $8,467
113,782
kWh
$584
-
gal
Savings
Cost
$ kWh $ gal
Electricity Usage Other Liquid (non-haz) Electricity Usage Other Liquid (non-haz)