IAC Assessment: SF0226
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0226
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2001
Principal Product Photoresist
NAICS n/a
SIC 2899 - Chemical Preparations, Nec
Sales $50,000,000-$100,000,000
# of Employees 90
Plant Area (Sq.Ft.) 77,000
Annual Production 50,000 Units
Production Hrs. Annual 4,335
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $462,854 6,168,000 kWh $0.08
Natural Gas $214,302 22,814 MMBtu $9.39
TOTAL ENERGY COSTS $742,087
RECOMMENDED SAVINGS* $120,400 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $48,037
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)
$ kWh $ MMBtu $ lb
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$11,294
Cost:
-
$962 7,857 $10,332 1,098 - - $962
7,857
kWh
$10,332
1,098
MMBtu
-
-
lb
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,916
Cost:
-
$3,916 31,971 - - - - $3,916
31,971
kWh
-
-
MMBtu
-
-
lb
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$726
Cost:
$30
$726 5,925 - - - - $726
5,925
kWh
-
-
MMBtu
-
-
lb
04: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING Savings:
$16,154
Cost:
$1,260
- - $16,154 1,716 - - -
-
kWh
$16,154
1,716
MMBtu
-
-
lb
05: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$35,839
Cost:
$11,800
$35,839 292,684 - - - - $35,839
292,684
kWh
-
-
MMBtu
-
-
lb
06: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$844
Cost:
$535
- - $844 99 - - -
-
kWh
$844
99
MMBtu
-
-
lb
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,016
Cost:
$3,275
$5,016 40,965 - - - - $5,016
40,965
kWh
-
-
MMBtu
-
-
lb
08: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$3,717
Cost:
$2,500
$3,717 30,343 - - - - $3,717
30,343
kWh
-
-
MMBtu
-
-
lb
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$16,944
Cost:
$14,649
$16,944 138,320 - - - - $16,944
138,320
kWh
-
-
MMBtu
-
-
lb
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,758
Cost:
$2,040
$1,758 14,358 - - - - $1,758
14,358
kWh
-
-
MMBtu
-
-
lb
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$863
Cost:
$1,126
$863 7,044 - - - - $863
7,044
kWh
-
-
MMBtu
-
-
lb
12: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$5,217
Cost:
$8,000
- - $5,217 554 - - -
-
kWh
$5,217
554
MMBtu
-
-
lb
13: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$8,563
Cost:
$24,267
$8,563 69,930 - - - - $8,563
69,930
kWh
-
-
MMBtu
-
-
lb
14: 3.6194 SHIP HYDRAULIC OIL TO SECONDARY FUEL PROGRAM Savings:
$9,549
Cost:
$15,524
- - - - $9,549 - -
-
kWh
-
-
MMBtu
$9,549
-
lb
TOTAL RECOMMENDED Savings:
$120,400
Cost:
$85,006
$78,304 639,397 $32,547 3,467 $9,549 - $78,304
639,397
kWh
$32,547
3,467
MMBtu
$9,549
-
lb
TOTAL IMPLEMENTED Savings:
$48,037
Cost:
$21,276
$47,193 385,394 $844 99 - - $47,193
385,394
kWh
$844
99
MMBtu
-
-
lb
Savings
Cost
$ kWh $ MMBtu $ lb
Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)