IAC logo
IAC Assessment: SF0252
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0252
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2003
Principal Product Adhesives, Glue, and Gummed Paper Tape
NAICS 325520 - Adhesive Manufacturing
SIC 2891 - Adhesives And Sealants
Sales $5,000,000-$10,000,000
# of Employees 26
Plant Area (Sq.Ft.) 45,000
Annual Production 4,500,000 Pounds
Production Hrs. Annual 2,875
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $47,742 349,520 kWh $0.14
Electricity Demand $9,055 2,151 kW-months/year $4.21
Natural Gas $19,040 2,897 MMBtu $6.57
TOTAL ENERGY COSTS $93,263
RECOMMENDED SAVINGS* $30,240 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,621
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,775
Cost:
$500
$3,275 23,977 - - - - $(-500) - - - $3,275
23,977
kWh
-
-
kW-months/year
-
-
MMBtu
$(-500)
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$636
Cost:
$814
$544 3,981 $92 21 - - - - - - $544
3,981
kWh
$92
21
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.2314 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT Savings:
$2,342
Cost:
$4,612
$2,792 20,442 $123 28 $(-573) (-87) - - - - $2,792
20,442
kWh
$123
28
kW-months/year
$(-573)
(-87)
MMBtu
-
-
$
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$846
Cost:
$2,550
$797 5,838 $49 11 - - - - - - $797
5,838
kWh
$49
11
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.9121 INSTALL WIND POWERED ELECTRIC GENERATOR Savings:
$23,641
Cost:
$205,000
$27,731 204,480 - - - - - - $(-4,090) - $27,731
204,480
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$(-4,090)
-
$
TOTAL RECOMMENDED Savings:
$30,240
Cost:
$213,476
$35,139 258,718 $264 60 $(-573) (-87) $(-500) - $(-4,090) - $35,139
258,718
kWh
$264
60
kW-months/year
$(-573)
(-87)
MMBtu
$(-500)
-
$
$(-4,090)
-
$
TOTAL IMPLEMENTED Savings:
$3,621
Cost:
$3,050
$4,072 29,815 $49 11 - - $(-500) - - - $4,072
29,815
kWh
$49
11
kW-months/year
-
-
MMBtu
$(-500)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes