Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2003 |
Principal Product | Adhesives, Glue, and Gummed Paper Tape |
NAICS | 325520 - Adhesive Manufacturing |
SIC | 2891 - Adhesives And Sealants |
Sales | $5,000,000-$10,000,000 |
# of Employees | 26 |
Plant Area (Sq.Ft.) | 45,000 |
Annual Production | 4,500,000 Pounds |
Production Hrs. Annual | 2,875 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $47,742 | 349,520 | kWh | $0.14 |
Electricity Demand | $9,055 | 2,151 | kW-months/year | $4.21 |
Natural Gas | $19,040 | 2,897 | MMBtu | $6.57 |
TOTAL ENERGY COSTS | $93,263 | |||
RECOMMENDED SAVINGS* | $30,240 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,621 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,775 Cost: $500 |
$3,275 | 23,977 | - | - | - | - | $(-500) | - | - | - |
$3,275 23,977 kWh |
- - kW-months/year |
- - MMBtu |
$(-500) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $636 Cost: $814 |
$544 | 3,981 | $92 | 21 | - | - | - | - | - | - |
$544 3,981 kWh |
$92 21 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2314 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT |
Savings: $2,342 Cost: $4,612 |
$2,792 | 20,442 | $123 | 28 | $(-573) | (-87) | - | - | - | - |
$2,792 20,442 kWh |
$123 28 kW-months/year |
$(-573) (-87) MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $846 Cost: $2,550 |
$797 | 5,838 | $49 | 11 | - | - | - | - | - | - |
$797 5,838 kWh |
$49 11 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.9121 INSTALL WIND POWERED ELECTRIC GENERATOR |
Savings: $23,641 Cost: $205,000 |
$27,731 | 204,480 | - | - | - | - | - | - | $(-4,090) | - |
$27,731 204,480 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$(-4,090) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $30,240 Cost: $213,476 |
$35,139 | 258,718 | $264 | 60 | $(-573) | (-87) | $(-500) | - | $(-4,090) | - | $35,139 258,718 kWh |
$264 60 kW-months/year |
$(-573) (-87) MMBtu |
$(-500) - $ |
$(-4,090) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,621 Cost: $3,050 |
$4,072 | 29,815 | $49 | 11 | - | - | $(-500) | - | - | - | $4,072 29,815 kWh |
$49 11 kW-months/year |
- - MMBtu |
$(-500) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes |