IAC logo
IAC Assessment: SF0332
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0332
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2006
Principal Product Paperborad
NAICS 322130 - Paperboard Mills
SIC 2631 - Paperboard Mills
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 570
Annual Production 70 Tons
Production Hrs. Annual 8
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,540,830 23,627,086 kWh $0.11
Electricity Demand $105,793 39,896 kW-months/year $2.65
Natural Gas $603,529 4,954,520 MMBtu $0.12
TOTAL ENERGY COSTS $3,250,152
RECOMMENDED SAVINGS* $764,543 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $76,727
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$10,511
Cost:
-
- - - - $10,511 1,413 -
-
kWh
-
-
kW-months/year
$10,511
1,413
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$66,216
Cost:
$5,557
- - - - $66,216 8,645 -
-
kWh
-
-
kW-months/year
$66,216
8,645
MMBtu
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$4,653
Cost:
$238
$4,546 44,104 $107 61 - - $4,546
44,104
kWh
$107
61
kW-months/year
-
-
MMBtu
04: 2.1224 REPLACE BOILER Savings:
$683,163
Cost:
$1,003,522
$27,713 268,616 $653 369 $654,797 85,483 $27,713
268,616
kWh
$653
369
kW-months/year
$654,797
85,483
MMBtu
TOTAL RECOMMENDED Savings:
$764,543
Cost:
$1,009,317
$32,259 312,720 $760 430 $731,524 95,541 $32,259
312,720
kWh
$760
430
kW-months/year
$731,524
95,541
MMBtu
TOTAL IMPLEMENTED Savings:
$76,727
Cost:
$5,557
- - - - $76,727 10,058 -
-
kWh
-
-
kW-months/year
$76,727
10,058
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas