IAC logo
IAC Assessment: SF0367
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0367
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2008
Principal Product Silicon Carbide
NAICS 327999 - All Other Miscellaneous Nonmetallic Mineral Product Manufacturing
SIC 3299 - Nonmetallic Mineral Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 20
Plant Area (Sq.Ft.) 15,000
Annual Production 1 Units
Production Hrs. Annual 8,760
Location (State) Hi
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $997,391 2,868,600 kWh $0.35
Electricity Demand $79,493 7,607 kW-months/year $10.45
TOTAL ENERGY COSTS $1,076,884
RECOMMENDED SAVINGS* $393,044 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $393,044
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$169,502
Cost:
$10,920
$169,502 487,508 - - $169,502
487,508
kWh
-
-
kW-months/year
02: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$121,210
Cost:
$720
$113,100 325,279 $8,110 776 $113,100
325,279
kWh
$8,110
776
kW-months/year
03: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$16,340
Cost:
$5,460
$16,340 46,997 - - $16,340
46,997
kWh
-
-
kW-months/year
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$360
Cost:
-
$360 1,043 - - $360
1,043
kWh
-
-
kW-months/year
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,679
Cost:
$143
$1,679 4,828 - - $1,679
4,828
kWh
-
-
kW-months/year
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$14,633
Cost:
$1,078
$14,633 42,085 - - $14,633
42,085
kWh
-
-
kW-months/year
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$9,914
Cost:
$1,497
$9,242 24,373 $672 64 $9,242
24,373
kWh
$672
64
kW-months/year
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$21,234
Cost:
$9,745
- - $21,234 58,746 -
-
kWh
$21,234
58,746
kW-months/year
09: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$11,030
Cost:
$7,537
$11,030 31,724 - - $11,030
31,724
kWh
-
-
kW-months/year
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,802
Cost:
$10,433
$7,394 21,267 $408 39 $7,394
21,267
kWh
$408
39
kW-months/year
11: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$14,022
Cost:
$18,000
$14,022 40,330 - - $14,022
40,330
kWh
-
-
kW-months/year
12: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,318
Cost:
$11,290
$5,318 15,295 - - $5,318
15,295
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$393,044
Cost:
$76,823
$362,620 1,040,729 $30,424 59,625 $362,620
1,040,729
kWh
$30,424
59,625
kW-months/year
TOTAL IMPLEMENTED Savings:
$393,044
Cost:
$76,823
$362,620 1,040,729 $30,424 59,625 $362,620
1,040,729
kWh
$30,424
59,625
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand