IAC logo
IAC Assessment: SF0403
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0403
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2011
Principal Product Capsules
NAICS 322220 - Paper Bag and Coated and Treated Paper Manufacturing
SIC 2671 - Paper Coated & Laminated, Packaging
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 100,000
Annual Production 700,000,000 Pieces
Production Hrs. Annual 6,888
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $216,796 2,662,102 kWh $0.08
Electricity Demand $26,014 4,752 kW-months/year $5.47
Electricity Fees $4,256 - $ -
Natural Gas $78,293 9,745 MMBtu $8.03
TOTAL ENERGY COSTS $325,359
RECOMMENDED SAVINGS* $26,200 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,972
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,239
Cost:
$720
$2,239 27,511 - - - - $2,239
27,511
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$1,307
Cost:
$2,006
$1,307 16,061 - - - - $1,307
16,061
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$681
Cost:
$1,471
$681 8,365 - - - - $681
8,365
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$8,148
Cost:
$20,097
$10,040 123,342 $2,355 430 $(-4,247) (-529) $10,040
123,342
kWh
$2,355
430
kW-months/year
$(-4,247)
(-529)
MMBtu
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$5,026
Cost:
$14,750
$5,026 61,740 - - - - $5,026
61,740
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,801
Cost:
$5,900
$1,465 17,993 $336 61 - - $1,465
17,993
kWh
$336
61
kW-months/year
-
-
MMBtu
07: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$4,142
Cost:
$15,378
$4,142 50,885 - - - - $4,142
50,885
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$1,944
Cost:
$9,877
$1,944 23,877 - - - - $1,944
23,877
kWh
-
-
kW-months/year
-
-
MMBtu
09: 2.7134 USE PHOTOCELL CONTROLS Savings:
$912
Cost:
$5,037
$706 8,667 $206 38 - - $706
8,667
kWh
$206
38
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$26,200
Cost:
$75,236
$27,550 338,441 $2,897 529 $(-4,247) (-529) $27,550
338,441
kWh
$2,897
529
kW-months/year
$(-4,247)
(-529)
MMBtu
TOTAL IMPLEMENTED Savings:
$7,972
Cost:
$19,974
$7,636 93,807 $336 61 - - $7,636
93,807
kWh
$336
61
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas