IAC logo
IAC Assessment: SF0408
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0408
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2012
Principal Product Sliced Pickles and Peppers
NAICS 311421 - Fruit and Vegetable Canning
SIC 2035 - Pickles, Sauces, And Salad Dressings
Sales $50,000,000-$100,000,000
# of Employees 135
Plant Area (Sq.Ft.) 120,000
Annual Production 3,500,000 Pieces
Production Hrs. Annual 5,568
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $219,831 1,739,199 kWh $0.13
Electricity Demand $42,931 3,936 kW-months/year $10.91
Electricity Fees $1,931 - $ -
LPG $120,362 6,039 MMBtu $19.93
TOTAL ENERGY COSTS $385,055
RECOMMENDED SAVINGS* $246,142 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $238,073
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG
$ kWh $ kW-months/year $ MMBtu
01: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$4,725
Cost:
-
$1,015 8,127 - - $3,710 190 $1,015
8,127
kWh
-
-
kW-months/year
$3,710
190
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,111
Cost:
-
$2,111 16,904 - - - - $2,111
16,904
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,571
Cost:
$80
$1,315 10,526 $256 26 - - $1,315
10,526
kWh
$256
26
kW-months/year
-
-
MMBtu
04: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$3,344
Cost:
$4,267
$3,344 26,771 - - - - $3,344
26,771
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,255
Cost:
$11,297
$2,543 20,360 $712 74 - - $2,543
20,360
kWh
$712
74
kW-months/year
-
-
MMBtu
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$231,136
Cost:
$1,514,353
$191,042 1,541,092 $40,094 5,094 - - $191,042
1,541,092
kWh
$40,094
5,094
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$246,142
Cost:
$1,529,997
$201,370 1,623,780 $41,062 5,194 $3,710 190 $201,370
1,623,780
kWh
$41,062
5,194
kW-months/year
$3,710
190
MMBtu
TOTAL IMPLEMENTED Savings:
$238,073
Cost:
$1,525,730
$197,011 1,588,882 $41,062 5,194 - - $197,011
1,588,882
kWh
$41,062
5,194
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG